Operating instruction
High-Z T-Series
Siemensstrasse 13-15
D-47608 Geldern Tel. +49 (0)2831/91021-20
Page 65
15.02.2014
8.5
Measures after maintenance
After completion of maintenance and before turning on the machine, perform the
following steps:
1 Check all previously loosened screw connections for
tightness.
2 Verify that all previously removed protective devices and
covers are reinstalled correctly.
3 Ensure that all tools, materials and other equipment
used were removed from the work area.
4 Clean work area and remove any spilled substances such
as fluids, processing material or similar materials.
5 Ensure that all safety devices on the machine function
properly.