Operating instruction
High-Z T-Series
Siemensstrasse 13-15
D-47608 Geldern Tel. +49 (0)2831/91021-20
Page 58
15.02.2014
8.3
Maintenance Schedule
In the following sections, the maintenance is described that is necessary for optimum and
trouble-free operation of the machine.
If increased wear can be seen during regular inspections reduce the required maintenance
intervals according to the actual wear and tear. For questions about maintenance work and
intervals, contact the manufacturer; see contact details on page 7.
Refer to the separate operating instructions, for the maintenance of the
supplied components.
Modell HIGH-Z Series S-400 / S-720 / S-1000
Interval
Maintenance
To be carried out by
Daily
Cleaning the machine
Operator
Check the machine for damage and wear
qualified personnel
10 Hours
Grease Trapezoidal Thread Spindle and
ball screw
qualified personnel
Oil linear guides
qualified personnel
20 Hours
Grease ball screws of x and y axis through
the provided grease socket
qualified personnel
50 Hours
Grease motor bearings through the
provided funnel type lubrication fitting
qualified personnel
As required
Clean the machine from the outside with a
cloth DIN 61650
Operator