5
SECTION 2 Installation
2C-4. Flow Test
1. Temporarily disconnect tubing from inlet side of the check
valve and attach included flow meter assembly (see Figure 3).
2. Hold the flow meter assembly so that the clear plastic chamber
is vertical and pointed down.
3. Turn on the pool pump as this allows the injector to pull a
vacuum. Under normal operation, the ball in the flow meter
assembly will be floating between the min and max lines. At
a minimum, the ball should indicate at least a small amount
of air flow. If you experience complications, see Section 4E.
Troubleshooting.
4. After the system flow has been verified, remove the flow meter
assembly and reconnect the tubing to the inlet side of the
check valve. Secure all tube connections on the check valve
assembly with tube clamps.
2D. Main Power
Connect the DEL AOP-S to the pool timing clock so that it operates
simultaneously with the pool pump. The circuit must be protected by
a Ground Fault Circuit Interrupter (G.F.C.I.) installed in accordance to
electrical code.
The AOP-S has three wires provided for electrical connection.
Ensure that the AC power source is within the AOP-S input power
specifications and connect as shown on wiring decal: black wire to
Line (or Line 1), white wire to neutral (or Line 2), and green wire to
ground.
A knockout (1/2” trade size) is supplied for appropriate wiring conduit/
fittings per local requirement.
A bonding lug is located on the bottom of the unit for connection to
the pool bonding grid.
Содержание DEL AOP-S
Страница 19: ...16 NOTES...
Страница 20: ...CMP LLC 36 HERRING ROAD NEWNAN GA 30265 WWW C M P COM DEL 0421AB...