background image

11

SECTION 4 Maintenance & Service

4D. UV Lamp and Quartz Tube Service

4D-1. UV Lamp Removal

For maximum UV sanitization effect, replace the UV lamp after 

13,000 hours of operation.

Follow the instructions below for UV lamp replacement and 

refer to Figure 6.

1.  Make sure the unit is disconnected from power and the lamp 

has cooled before performing maintenance.

2.  Disconnect the power connector between the UV lamp and 

wire harness.

3.  Gently pull on the UV lamp wires until the top of the UV 

lamp is out of the UV lamp retainer. Grasp the white ceramic 

end of the UV lamp and pull until it is fully removed. If the 

UV lamp will be reused, avoid touching the UV lamp glass 

with your bare hands. Handle the UV lamp carefully and set 

aside. If discarding, dispose of properly (see Important Safety 

Instructions at the beginning of this manual).

Figure 6: Lamp and Quartz Tube Removal

UV Lamp

UV Lamp 

Retainer

Quartz Tube

Quartz Tube

Adapter

Sealing O-Ring

Содержание DEL AOP-S

Страница 1: ...4 2535 01 Rev E DEL AOP S INSTALLATION INSTRUCTIONS PRODUCT MANUAL C M P COM DEL OR VISIT C M P COM TECH Scanfor Step by step instructions SEC 50 XX...

Страница 2: ...ork is performed Failure to do so could result in serious injury or death The DEL AOP S must be installed in an outdoor location or indoors in a forced air ventilated room and installed so that the or...

Страница 3: ...7 3C System Shut Down 7 SECTION 4 Maintenance Service 4A System Electro Mechanical Overview 7 4B System Maintenance 8 4C Ozone Module Service 9 4D UV Lamp and Quartz Tube Service 11 4E Troubleshooting...

Страница 4: ...equirements Mounting Wall or post mount in a clean protected area Ambient Temp 35 F 120 F 2 C 49 C 2A Location Mount in a clean protected area out of direct sunlight The unit must be installed in an o...

Страница 5: ...l screws or other hardware appropriate for mounting surface through the two mounting holes built into the enclosure Figure 1 Mounting Location Notations cover removed Ozone Output Barb Bonding Lugs Kn...

Страница 6: ...r AFTER all other equipment to avoid collection of gas in the system and possible failure of pool system components 2C 2 Pressure Test If a pressure test is required it should be performed prior to in...

Страница 7: ...heater Variable Rate Check Valve Filter If Equipment is Above Water Level A Check Valve is Required Between Injector Pool Pump Dedicated Pool Return Preferred Ozone UV System Check Valve Heater Main...

Страница 8: ...ssembly and reconnect the tubing to the inlet side of the check valve Secure all tube connections on the check valve assembly with tube clamps 2D Main Power Connect the DEL AOP S to the pool timing cl...

Страница 9: ...as possible to start with 1 Backwash or clean filters one day before starting the AOP S 2 Superchlorinate pool water using a chlorine based shock treatment 3 Test pool chemistry and adjust pH between...

Страница 10: ...t down for an extended period disconnect the AOP S from the power source and disconnect the check valve assembly tubing from the ozone output barb of the AOP S When winterizing ensure that all water i...

Страница 11: ...intenance 4B 1 Ordering Information To locate a dealer nearest you call 1 800 733 9060 or visit our website www c m p com Be prepared to provide the following information Name Address Model Number Dat...

Страница 12: ...check valve failure Replace the check valve assembly replacement part number 9 0770 01 immediately WARNING Trace amounts of nitric acid may be present in the check valve assembly and could be mildly...

Страница 13: ...ts securing the ozone module to the backplate 5 Slide the ozone module and loosened backplate right to free the ozone module from the enclosure 6 Disconnect ozone supply tubing from ozone output barb...

Страница 14: ...the power connector between the UV lamp and wire harness 3 Gently pull on the UV lamp wires until the top of the UV lamp is out of the UV lamp retainer Grasp the white ceramic end of the UV lamp and p...

Страница 15: ...the UV lamp will be diminished and decrease system performance The quartz tube should be removed from the AOP S at least once a year for inspection and cleaning 1 Make sure the AOP S is drained of po...

Страница 16: ...ers and tighten until the UV lamp retainer is seated completely against the quartz tube adapter 4 Turn on the pool pump and check the joint around the UV lamp retainer for leaks 5 If it leaks please c...

Страница 17: ...d Ensure that the check valve is installed with the arrow pointing towards the injector e Be sure that the check valve has not become fouled with debris Disconnect the check valve assembly from the t...

Страница 18: ...__________________ System Purchased From _____________________________________________ Installation Date _____________________________ Serial Number _______________________________ Model Number ______...

Страница 19: ...16 NOTES...

Страница 20: ...CMP LLC 36 HERRING ROAD NEWNAN GA 30265 WWW C M P COM DEL 0421AB...

Отзывы: