background image

GENERAL INFORMATION

4

DANGER

Electric Shock Hazard. Be sure to turn power OFF and disconnect from power source 

before any work is performed. Failure to do so could result in serious injury or death. 

AOP 50 PREPARATION

Open the unit door and locate the ozone generator assembly on the left wall of the enclosure – most of 

this subassembly will be replaced. Locate the ozone gas line which will be replaced with a longer version.

NOTICE

 The wire harness will be reused and does not need to be removed from the unit during 

service. Take care not to damage any wires or connectors during the process. 

 

WARNING

Trace amounts of nitric acid may be present in the tubing. Wear proper safety equipment 

(gloves and eye protection) and avoid direct contact with any condensation in the line. 

REMOVING THE OZONE GENERATOR SUBASSEMBLY

1.  Loosen tubing clamp and disconnect the ozone gas line from the injector tube adapter. 

2. Disconnect the ozone module power connectors (6) from the wire harness. 

3. Loosen the terminal block from the ozone bracket by removing the two mounting screws. 

4. Remove the mounting screws of the ozone bracket and remove the ozone generator subassembly.  

5. Carefully remove zip-ties as necessary to free subassembly from unit. 

6. The wire harness and terminal block will remain in the unit.  

FIGURE 1: OZONE SUBASSEMBLY

Power 

Connectors

Terminal 

Block

Ozone Bracket Mounting Screw Locations

Ozone Bracket 

Mounting Screw 

Location

Ozone Gas Line

Tubing 

Clamp

Содержание DEL AOP 50

Страница 1: ...4 2835 01 Rev A C M P COM DEL DEL AOP 50 OZONE UPGRADE SERVICE INSTRUCTIONS ...

Страница 2: ...e before any service work is performed Failure to do so could result in serious injury or death The DEL AOP 50 must be installed in an outdoor location or indoors in a forced air ventilated room and installed so that the orientation is exactly as shown in Figure 1 Install to provide water drainage of generator to protect electrical components Mount the DEL AOP 50 so that it is inaccessible to anyo...

Страница 3: ...TENTS Covered by one or more U S patents or pending patent applications See c m p com patents for details AOP 50 Preparation 4 Removing the Ozone Generator Subassembly 4 Installing the New Ozone Generator Subassembly 5 Initial System Start Up 5 ...

Страница 4: ...cid may be present in the tubing Wear proper safety equipment gloves and eye protection and avoid direct contact with any condensation in the line REMOVING THE OZONE GENERATOR SUBASSEMBLY 1 Loosen tubing clamp and disconnect the ozone gas line from the injector tube adapter 2 Disconnect the ozone module power connectors 6 from the wire harness 3 Loosen the terminal block from the ozone bracket by ...

Страница 5: ... wire harness 4 Connect the new longer ozone gas line to the injector tube adapter and secure with tubing clamp The ozone gas line contains a check valve install so that the arrow on the check valve points towards the injector tube adapter 5 Connect the other end of the ozone gas line to the bottom of the ozone outlet manifold and secure with tubing clamp SYSTEM STARTUP Restore power to the unit a...

Страница 6: ...m Below Keep for Your Records Installer _______________________________________________________________ System Purchased From ______________________________________________ Installation Date _____________________________ Serial Number _______________________________ ...

Страница 7: ...7 NOTES ...

Страница 8: ...CMP LLC 36 HERRING ROAD NEWNAN GA 30265 WWW C M P COM DEL 0621AB ...

Отзывы: