M5
T
M5
T
X1
X1
S
1
2
3
4
1
4
2
2
3
4
O4
O3
O2
O1
STEP 14: Install the Roof Plates on the Short Sides of the Gazebo. Work your way from left to right.
Start by sliding Roof Plate 5 (Part O1) into position. Then overlap Roof Plate 6 (Part O2) as shown in
the diagram and Slide Roof Plate 6 (Part O2) into Position.
Affix Roof Plate 5 (Part O1) and Roof Plate 6 (Part O2) into place by using the bolts and Plastic
gap
fillers
(Part M5) at the Positions 2 and 4 on the diagram.
Slide Roof Plate 7 (Part O3) into position. Roof Plate 6 (Part O2) should Overlap Roof Plate 7 (Part O3)
as shown in the diagram.
Affix Roof Plate 7 (Part O3) and Roof Plate 6 (Part O2) into place by using the bolts
at the Positions 1 and 3 on the diagram.
Slide Roof Plate 8 (Part O4) into position. Roof Plate 7 (Part O3) should Overlap
U
Roof Plate 8 (Part O4) as shown in the diagram.
Affix Roof Plate 8 (Part O4) into place by
using the bolts and Plastic
gap fillers
S
(Part M5) at the Positions 2 and
4 on the diagram.