
UNITIZED TRANSAXLE
Unitized Transaxle Removal
2005 FE350 Gasoline Vehicle Maintenance and Service Supplement
Page 16-9
16
4.5. Remove the cover from the electrical component box. Then loosen the hardware securing the
accelerator cable to the box. Disconnect the cable from the actuator cam and remove it from the
box
(Figure 16-13, Page 16-9)
.
4.6. Remove retaining nut and disconnect the engine ground wire from the oil filler tube mounting
bracket
(Figure 16-14, Page 16-9)
.
4.7. Loosen nuts securing shifter cable to shifter cable mounting bracket. Then disconnect the shifter
cable rod end from the shifter arm on the unitized transaxle and remove the cable from the cable
mounting bracket
(Figure 16-15, Page 16-9)
.
4.8. Mark for identification and then disconnect the 6-gauge white wire (F2 post), 6-gauge black ground
wire (A2 post), and 16-gauge yellow wire (DF post) from starter/generator
(Figure 16-16,
Page 16-9)
.
Figure 16-13 Throttle Cable
Figure 16-14 Engine Ground Wire
Figure 16-15 Shifter Cable
Figure 16-16 Generator Wires
RETAINING NUTS
TOP VIEW
ENGINE GROUND
RETAINING NUT
TOP VIEW
Loosen nuts.
Pull spring release back to
remove shifter cable from lever.
DF
F2
WHITE WIRE
YELLOW WIRE
GROUND WIRE
AT A2TERMINAL