6
IMCM-20.291121
www.ecoflo.com.au
1300-138-182
MATERIALS REQUIRED
• Water to wet starter material.
• Additional 50mm PVC pipe (coupling and bends if absorption trench is to be located some
distance away from tank). Additional pipe bends if needed for vent pipe.
• In poor soil conditions, extra length of trenching arch or agi drain may be required.
• Drainage gravel for excess fluids drain.
INSTALLATION SUMMARY
1. Ensure the tank is in a position so that the toilet chute will be perfectly straight over the
tank below.
2. Ensure the tank foundation is solid with a concrete, sand or crusher dust bed.
3. Mark and cut holes in the floor for the toilet chute.
4. Mark and cut holes in the tank top.
5. Insert toilet chute and pedestal.
6. Install the vent system.
7. Install the liquid end-product drain pipe and absorption/transpiration trench.
8. Connect fan to power source.
9. Check everything is sealed.
10. Place a starter-bed of suitable bulking agent (e.g. wood shavings) in the unit.
11. Wet bulking agent before use of toilet.
12. Add starter bacteria after 14 days of use.
CONDITIONS
Any decomposition process works better where temperatures are warmer
. Over the winter
months the composting process slows or can even temporarily stop where temperatures in the
pile drop below 4°C.
>13°C
Ideal temperature for composting
<13°C
Composting process slows
Содержание CM14
Страница 1: ...CM20 INSTALLATION MANUAL AUS NZ IMCM 20 291121 Lic No SMKH25591 AS NZS 1546 2 SAI Global...
Страница 16: ......