background image

©2021 Kohler Co. 

1 1355511-B2-A

•  Please read these instructions carefully to familiarize 

yourself with the required tools, materials, and installation 

sequences. Follow the sections that pertain to your particu-

lar installation. This will help you avoid costly mistakes. In 

addition to proper installation, read all operating and safety 

instructions. 

•  All information in these instructions is based upon the latest 

product information available at the time of publication. 

Kohler Co. reserves the right to make changes in product 

characteristics, packaging, or availability at any time without 

notice.

•  These instructions contain important care, cleaning, and 

warranty information-

please leave instructions for the 

consumer.

NOTES

•  Observe all local plumbing and building codes. 

•  Shut off the water supply.

•  Seat post holes are on 140mm (5-1/2”) centers.

•  51mm (2”) passageway.

•  Water depth from the rim is 157mm.

•  Ensure that the new drain has the correct roughing-in 

dimension.

•  Be very careful while working with vitreous china products. 

Vitreous china can break or chip if the bolts and nuts are 

overtightened, or if carelessly handled.

  Carefully inspect the new fixture for any sign of Damage.

BEFORE YOU BEGIN /               / 

ก่่อนเริ่่�มก่าริ่ติ่ดติ้�ง

VEIL  TWO-PIECE  TOILET   

INSTALLATION INSTRUCTION

สุุขภั้ณฑ์์สุองชิ้่�น ริุ่่น เวล

ข้อแนะนำาก่าริ่ติ่ดติ้�ง

• 

โปรดอ่่านคำำาแนะนำาเหล่่าน้�อ่ย่่างล่ะเอ่้ย่ดเพื่่�อ่ทำำาคำวามคำ้�นเคำย่กัับเคำร่�อ่งม่อ่ 

วัสด้ แล่ะล่ำาดับกัารติิดติั�งทำ้�จำำาเป็น ทำำาติามหัวข้�อ่ทำ้�เกั้�ย่วข้�อ่งกัับกัารติิดติั�ง 

วิธี้น้�จำะช่่วย่คำ้ณหล่้กัเล่้�ย่งข้�อ่ผิิดพื่ล่าดทำ้�ม้คำ่าใช่�จำ่าย่สูง นอ่กัจำากักัารติิดติั�งทำ้�

เหมาะสมแล่�ว โปรดอ่่านคำำาแนะนำากัารใช่�งานแล่ะคำวามปล่อ่ดภััย่ทำั�งหมด

• 

ข้�อ่มูล่ในคำู่ม่อ่เล่่มน้�มาจำากัข้�อ่มูล่ผิล่ิติภััณฑ์์ล่่าส้ดทำ้�ม้อ่ยู่่ในช่่วงเวล่ากัารจำัด

พื่ิมพื่์  บริษััทำฯ ข้อ่สงวนสิทำธีิ�ในกัารเปล่้�ย่นแปล่งข้�อ่มูล่ผิล่ิติภััณฑ์์แล่ะบรรจำ้

ภััณฑ์์ทำ้�ม้อ่ยู่่โดย่มิติ�อ่งแจำ�งให�ทำราบล่่วงหน�า

• 

คำำาแนะนำาเหล่่าน้�ประกัอ่บด�วย่ข้�อ่มูล่กัารดูแล่รักัษัา กัารทำำาคำวามสะอ่าด

แล่ะกัารรับประกััน โปรดมอ่บเอ่กัสารให�กัับเจำ�าข้อ่งส้ข้ภััณฑ์์

ข้อสุ้งเก่ติ

• 

ติรวจำสอ่บระบบส้ข้าภัิบาล่

• 

ปิดวาล่์วนำ�าเข้�า

• 

ระย่ะกั่�งกัล่างถึ่งกั่�งกัล่างรูย่่ดฝารอ่งนั�งอ่ยู่่ทำ้� 140 มม. (5-1/2”)

• 

ข้นาดทำ่อ่นำ�าทำิ�ง 51 มม. (2”)

• 

คำวามล่่กัจำากัข้อ่บโถึส้ข้ภััณฑ์์ถึ่งผิิวหน�านำ�า 157 มม.

• 

ให�แน่ใจำว่า ทำ่อ่ระบาย่นำ�าทำิ�งม้ระย่ะข้นาดติรงติามระย่ะกัารติิดติั�งทำ้�ถึูกัติ�อ่ง

• 

ใช่�คำวามระมัดระวังให�มากั ในข้ณะทำ้�ทำำางานกัับเคำร่�อ่งส้ข้ภััณฑ์์ เคำร่�อ่ง

ส้ข้ภััณฑ์์อ่าจำหักัหร่อ่บิ�นได� หากัข้ันนอ่ติแน่นจำนเกัินไป หร่อ่จำับอ่ย่่างไม่

ระมัดระวัง

• 

ติรวจำสอ่บอ่้ปกัรณ์กัารติิดติั�งอ่ย่่างระมัดระวัง เพื่่�อ่ป�อ่งกัันคำวามเส้ย่หาย่

Содержание VEIL K-1666K-SL-0

Страница 1: ...arefully inspect the new fixture for any sign of Damage BEFORE YOU BEGIN ก อนเริ มการติิดตั ง VEIL TWO PIECE TOILET INSTALLATION INSTRUCTION สุุขภััณฑ สองชิ น รุ น เวล ข อแนะนำำ การติิดตั ง โปรดอ านคำำ แนะนำำ เหล านี อย างละเอีียดเพื อทำำ ความคุ นเคยกัับเครื องมืือ วััสดุุ และลำำ ดัับการติิดตั งที จำำ เป น ทำำ ตามหััวข อที เกี ยวข องกัับการติิดตั ง วิิธีีนี จะช วยคุุณหลีีกเลี ยงข อผิิดพลาดที มีีค ...

Страница 2: ...ened to design specifications If re tightening is required wrench tighten 1 4 turn past finger tight TOOLS AND MATERIALS REQUIRED Not supplied 254mm 10 adjustable wrench 305mm 12 pipe wrench Metal file file cut Tape measure Tubing cutter Level Hacksaw Putty knife Screwdriver Toilet gasket wax seal Toilet installation flange Toilet T bolt 2 8mm 5 16 diameter Toilet supply shut off valve NOTICE If t...

Страница 3: ... the supply shut off valve with the outlet vertical NOTICE Do not use white cement or high lime content cements to install the toilet The expansion of cement due to a rise in temperature may make the toilet crack or cause damage Kohler is not resposible for any damage caused by installation with the use of cement INSTALLATION การติิดตั ง Closet Flange หน าแปลน ถอดปะเก นเก าออกจากพื นและหน าแปลนด ว...

Страница 4: ...าะ Install bracket ติิดตั งอุุปกรณ ยึึดขาฐาน Firmly press the toilet gasket onto the toilet outlet of plastic NOTE 1 Wax ring type toilet gasket should not be installed at temperatures less than 21 C NOTE 2 If you are using a toilet gasket with an integral plastic sleeve make sure the gas ket is positioned with the sleeve facing away from the toilet Install plastic to ground and mounted with 3 set...

Страница 5: ...owl rim insert into waste trap For Ceramic Trap Outlet Install the wax ring on the floor สำำ หรัับท อพลาสติิก ค อยๆ วางสุุขภััณฑ อย างระมััดระวััง วางน ำำ หนัักที ขอบ หน าโถสุุขภััณฑ เพื อประกอบท อน ำำ ทิ งเข ากัับข อต อท อ น ำำ ทิ งพลาสติิก ขัันสกรููเข ากัับอุุปกรณ ยึึดโถสุุขภััณฑ กระทั งยึึดโถ สุุขภััณฑ แน น ขัันสลัับซ าย ขวา เพื อให สุุขภััณฑ อยู ใน ตำำ แหน งกึ งกลาง สวมฝาครอบปิิดสกรูู อย าขััน...

Страница 6: ...unterclockwise While holding a container over the uncapped VALVE to prevent splashing turn water supply on and off a few times Leave water supply off Replace END by engaging lugs and rotating 1 8 turn clockwise Make certain the top is turned to the locked position Valve may not turn on if top is not fully in the locked position Turn on water supply Check that water level is at the marked water lin...

Страница 7: ...ce located under float valve cap Replace fill valve cap assembly by engaging lugs and rotating 1 8 turn clockwise Turn water on Install filter in supply line to prevent recurring problems B Fill valve seal located under float valve cap may be cracked or split B Replace seal C Tank water level set above overflow level C During fill cycle hold float under water a few seconds to allow it to fill with...

Страница 8: ...1355511 B2 A 8 2021 Kohler Co ...

Страница 9: ...ด วาล ว ค ระดัับน ำำ ในถัังพัักน ำำ ตั งไว เหนืือระดัับน ำำ ล น ค ระหว างรอบการเติิมน ำำ ให ลููกลอยอยู ใต น ำำ สองสาม วิินาทีีเพื อให น ำำ เต ม ปรัับลููกลอยโดยปรัับเกลีียวรููป กากบาทบนแกนลููกลอยและเลื อนลููกลอยขึ นหรืือลงบน ก านลููกลอยจนระดัับน ำำ อยู ที แนวเส นน ำำ ที มีีเครื องหมาย ง น ำำ รั วผ านฟลััชบอล ง เปลี ยนฟลััชบอล จ ก านกดชำำ ระค าง จ หมุุนนอตคัันโยกก านกดชำำ ระทวนเข มนาฬิิกาเพื อคลาย จ...

Страница 10: ...arefully Do not use abrasive cleaners or solvents WARNING Risk of property or product damage Do not use in tank cleaners Products containing chlorine calcium hypochlorite can seriously damage fittings in the tank This damage can cause leakage and property damage Kohler Company shall not be responsible or liable for any damage to these tank fittings caused by the use of cleaners containing chlorine...

Страница 11: ...สี ยงซึ งอาจก อให เกิิดความเสีียหายแก ทรััพย สิินหรืือผลิิตภััณฑ ชำำ รุุด ห ามใช น ำำ ยาทำำ ความสะอาดสุุขภััณฑ ภายในถัังพัักน ำำ เนื องจากน ำำ ยาทำำ ความสะอาดสุุขภััณฑ ที มีีส วนผสมของคลอไรด แคลเซีียมไฮโปคลอไรด อาจทำำ ให อุุปกรณ ภายในถัังพัักน ำำ เกิิดการรั วซึึมและชำำ รุุดได บริิษััทโคห เลอร จะไม รัับผิิดชอบหรืือรัับผิิดใดๆ ความเสีียหายต ออุุปกรณ ถัังเหล านี ที เกิิดจากการใช น ำำ ยาทำำ ความสะอาดป...

Страница 12: ...พันธ โทร 022046222 E mail callcenterthailand kohler com KOHLER ASIA PACIFIC LIMITED Asia Customer Service Centre No 158 Jiang Chang San Road Zhabei District Shanghai PRC 200436 Tel 86 21 2606 2572 Fax 86 21 6107 8900 KOHLER THAILAND PUBLIC COMPANY LIMITED 16th FL JasmineCityBldg 2 Soi Sukhumvit23 Sukhumvit Road Wattana Bangkok10110Thailand Call Center Tel 66 2204 6222 ...

Отзывы: