background image

4

IMCM-20.291121

www.ecoflo.com.au

1300-138-182

1x VENT COWL

3x SLIP JOINERS 

100mm

1x FAN IN HOUSING

1x TRANSFORMER

1x LIQUID DRAIN PIPE 

CONNECTOR 50MM

VENT ITEMS

DRAIN ITEMS

1x WALLACE SEAL 

100mm

2x 45° BEND 50MM

4x VENT PIPE SECTIONS

1x 90° BEND 100mm

2x VENT SUPPORT 

BRACKETS & 4 

SCREWS

1x 125mL 

ENZYME

BULKING 

MA

TERIAL

7x STARTER 

BULKING 

MATERIAL

CONSUMABLES

1x SPRAY BOTTLE

Содержание CM14

Страница 1: ...CM20 INSTALLATION MANUAL AUS NZ IMCM 20 291121 Lic No SMKH25591 AS NZS 1546 2 SAI Global...

Страница 2: ...DIVERSION 5 OPTIONAL FOR URINE DIVERSION 5 TOOLS REQUIRED 5 MATERIALS REQUIRED 6 INSTALLATION SUMMARY 6 CONDITIONS 6 POSITIONING THE TANK 7 TANK SUPPORT 7 EXCESS LIQUID DRAIN INSTALLATION 8 OPTIONAL Z...

Страница 3: ...o com au 1300 138 182 1x TOILET CHUTE COLLAR 1x CM20 TANK CM20 TANK ITEMS 1x TOILET CHUTE 1x SILICONE SEALANT 1x MAINTENANCE RAKE PEDESTAL ITEMS 16x ROOFING SCREWS 1x PEDESTAL TOILET SEAT SEALANT 1x H...

Страница 4: ...AN IN HOUSING 1x TRANSFORMER 1x LIQUID DRAIN PIPE CONNECTOR 50MM VENT ITEMS DRAIN ITEMS 1x WALLACE SEAL 100mm 2x 45 BEND 50MM 4x VENT PIPE SECTIONS 1x 90 BEND 100mm 2x VENT SUPPORT BRACKETS 4 SCREWS 1...

Страница 5: ...ERSION OPTIONAL FOR URINE DIVERSION 1X ZERO DISCHARGE UNIT 1x PVC DRAIN PIPE 50MM 1x TRENCH ARCH DRAIN WITH END CAPS GEOCLOTH Screwdriver Philips plain Jigsaw Tape Measure Caulking gun Marker Spade La...

Страница 6: ...sand or crusher dust bed 3 Mark and cut holes in the floor for the toilet chute 4 Mark and cut holes in the tank top 5 Insert toilet chute and pedestal 6 Install the vent system 7 Install the liquid...

Страница 7: ...ost tank For less maintenance of the compost pile the optimum location for the chute s to enter the tank is mid width in the rear half of the tank A clearance of at least 150mm from edge of chute to e...

Страница 8: ...S LIQUID DRAIN INSTALLATION Straight Pipe Trench Arch 45 Bend Straight Pipe 45 Bend 150 min 500 min 230 min SECTION VIEW Underground Trench Arch Drain Trench Arch Drain Gravel OPTIONAL ZERO DISCHARGE...

Страница 9: ...loor of the building is high above the top of the tank a chute extension piece s may be needed Extra lengths are available from your supplier Joints should be screwed with short self tapper screws and...

Страница 10: ...ecoflo com au 1300 138 182 Viewpoint Maintenance Access Enlarge the hole in the rubber chute collar so it will stretch snugly around the toilet chute without gaps Drip Edge Max 100mm SECTION VIEW Mar...

Страница 11: ...then press chute down again to seat firmly onto the floor SEALANT TOP FLOOR Bend and move the metal edging strip of the chute collar to the tank Lift up Push down 7 8 Run a bead of silicon sealant aro...

Страница 12: ...on of the unit the fewer bends that are used when installing the vent system the better NOTE The hole for the vent pipe is best at the side of the tank or along the top edge as far as practical from t...

Страница 13: ...installing the PVC pipe Secure pipe fittings according to building roofing instructions Complexity may vary Mount the fan housing onto the vent pipe Position the fan housing so that it can be easily...

Страница 14: ...on of the vent pipe The pipe should be supported against the wall of the building with the brackets provided 2 3 This configuration will vary depending on location of CM14 Install the vent cowl or opt...

Страница 15: ...KING MATERIAL Fine sawdust Large wood chips Wood shavings Lawn clippings Starter bed of bulking material to underside of baffle 1 2 BULKING MATERIAL 0 50m Hemp Sugar cane mulch NOT SUITABLE BULKING MA...

Страница 16: ......

Отзывы: