5.6 Operation
sequence
Close all vent valves in the high points of the unit hydraulic circuit
Close all drain valves in the low points of the unit hydraulic circuit:
•
Heat exchangers
•
Pumps
•
collectors
•
storage tank
1. Carefully wash the system with clean water: fill and drain the system several times.
2. Apply additives to prevent corrosion, fouling, formation of mud and algae.
3. Fill the plant
4. Vent the system
5. Execute leakage test.
6. Isolate the pipes to avoid heat dispersions and formation of condensate.
7. Leave various point of service free (wells, vent-holes etc).
Neglecting the washing will lead to several filter cleaning interventions and at worst cases can cause damages to the exchangers and the
other parts.
5.7 Recommended
connection
The installer must define:
•
component type
•
position in system
2
7
9
13
3
1
14
UNIT
6
10
12
4
5
8
15
F
11
1
antivibration joints
9
safety valve
2
piping support
10
Flow Switch
3
exchanger chemical cleaning bypass
11
pressure gauge
4
drain valve
12
thermometer
5
vent
13
filter
6
shut-off valve
14
Internal storage tank
7
Pump / circulating pump
15
Cleaning system bypass
8
expansion vessel
5.8 Water
filter
It must be installed immediately in the water input of the unit, in a position that is easily accessible for cleaning.
The filter never should be removed, this operation invalidates the guaranty.
5.9 Domestic hot water module
10 Accessories p. 49
5.10 Domestic hot water with solar energy
10 Accessories p. 49
5.11 Boiler management
10 Accessories p. 49
Содержание WSN-XIN 101
Страница 4: ...4 WSN XIN 21 141 M0V940M13 06...
Страница 13: ...M0V940M13 06 WSN XIN 21 141 13 4 5 GMX Supply grille Accessory Fix the grille with the screws...
Страница 48: ...48 WSN XIN 21 141 M0V940M13 06 Fan replacement...
Страница 60: ...60 WSN XIN 21 141 M0V940M13 06 10 7 Cabinet for Elfo Pool...
Страница 61: ...M0V940M13 06 WSN XIN 21 141 61 1 Cooling operation with parameter r5 0 2 Heating operation with parameter r5 1...