![ClimateMaster Trilogy VE 0930 Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/climatemaster/trilogy-ve-0930/trilogy-ve-0930_installation-operation-and-maintenance-instructions-manual_2624757016.webp)
16
G e o t h e r m a l H e a t i n g a n d C o o l i n g
Trilogy
®
Variable (VE) Series IOM - 60Hz HFC-410A
C r e a t e d : 4 O c t o b e r, 2 0 1 9
Figure 15b: Valve Position B - Unit Fill
Loop
Valve Position
Out
In
Flushing the Earth Loop
Flush Port
Front of Unit
Valve Position
Figure 15c: Valve Position C - Full Flush
Loop
Valve Position
Dead Head
Pump Test
for Air
Add Antifreeze
Now if Needed
Out
In
Flush Port
Front of Unit
Valve Position
Unit Fill
Unit fi ll valves should be switched to Position B to fi ll the
unit heat exchanger (see Figure 15b). The valves position
should be maintained until water is consistently returned
into the fl ush reservoir.
Loop Flush
Switch to valve Position A. The supply water may be shut off
and the fl ush cart turned on to begin fl ushing. Once the fl ush
reservoir is full, do not allow the water level in the fl ush cart
tank to drop below the pump inlet line or air can be pumped
back out to the earth loop. Try to maintain a fl uid level in the
tank above the return tee so that air can not be continuously
mixed back into the fl uid. Surges of 50 psi [345 kPa] can
be used to help purge air pockets by simply shutting off
the fl ush cart return valve going into the fl ush cart reservoir.
This process ‘dead heads’ the pump to 50 psi [345 kPa]. To
dead head the pump until maximum pumping pressure is
reached, open the valve back up and a pressure surge will
be sent through the loop to help purge air pockets from the
piping system. Notice the drop in fl uid level in the fl ush cart
tank. If all air is purged from the system, the level will drop
only 3/8” in a 10” [25.4 cm] diameter PVC fl ush tank (about
a half gallon [1.9 liters]) since liquids are incompressible. If
the level drops more than this level, fl ushing should continue
since air is still being compressed in the loop fl uid. Do this a
number of times.
NOTICE: Actual fl ushing time require will vary for each
installation due to piping length, confi guration, and fl ush
cart pump capacity. 3/8” or less fl uid level drop is the ONLY
indication that fl ushing is complete.
Move valves to position C. By switching both valves to this
position, water will fl ow through the loop and the unit heat
exchanger. Finally, the dead head test should be checked
again for an indication of air in the loop. Fluid level drop is
your only indication of air in the loop.
Pressurize and Operate
As shown in Figure 15d, close the fl ush cart return valve
to pressurize the loop to at least 50 psi [345 kPa], not to
exceed 75 psi [517 kPa]. Open the isolation valve to the
expansion tank and bleed air from the expansion tank piping
using the schraeder valve located in front of the expansion
tank. This will allow loop pressure to compress the
expansion tank bladder, thus charging the expansion tank
�
CAUTION!
�
CAUTION!
Never exceed a pressure of 100 psig in
a Trilogy unit. Pressure greater than 100 psig will
damage the unit pressure sensor causing the unit to
miscommunicate certain data points and may cause the
unit to nuisance fault.
Содержание Trilogy VE 0930
Страница 2: ...This page was intentionally left blank...
Страница 65: ...65 climatemaster com Trilogy Variable VE Series IOM 60Hz HFC 410A Created 4 October 2 0 1 9 Notes Notes...
Страница 66: ...66 Geothermal Heating and Cooling Trilogy Variable VE Series IOM 60Hz HFC 410A C reate d 4 O ctober 2019 Notes...
Страница 67: ...67 climatemaster com Trilogy Variable VE Series IOM 60Hz HFC 410A Created 4 October 2 0 1 9 Notes...