![Cleveland 24CGA6.2S Скачать руководство пользователя страница 30](http://html1.mh-extra.com/html/cleveland/24cga6-2s/24cga6-2s_operation-installation-maintenance-manual_2622803030.webp)
30
If the burners do not light within 7 minutes, there may be air in the gas supply lines
proceed to step 5.
5). Turn off electrical power to the Steamer, at both the ON/OFF levers/switches and the main
power switch.
NOTE:
When the burners fail to ignite, a safety circuit in the igniter control de-energizes
the system and closes the automatic gas valve. The safety circuit resets when
the steamer’s power is turned OFF and then back ON.
6). Wait 5 minutes and then repeat steps 2 through 6. If this is a brand-new installation, or an
excessive amount of air in the lines is suspected for any other reason, it may be necessary to
bleed the excess air from the lines. This should be done at a union or connection as close as
possible to the inlet of the automatic gas valve.
7). If the burner does not light after the third attempt, call a Cleveland Range authorized service
representative to adjust the burner controls.
8). Go to Shutdown Instructions.
b. Shutdown Instructions
1). Turn off electrical power to the steamer, at both the ON/OFF levers/switches and the main
power switch.
2). Turn off gas supply at the main manual gas valve.
2.
Startup Test Procedure Gas Gemini
There are a few operating differences between steamers with the dial timer controls and steamers with the
keypad controls.
The differences in cooking operation of the two types of timer controls are fully explained in the O After
performing the startup procedure, perform the test procedure as appropriate to the control panel on the
steamer being tested. Ignore any steps, which do not apply to the steamer being tested.
This procedure is appropriate for steamers with keypad control panels, dial timer control panels, or manual
control panels. Read through all steps of this procedure before starting. Complete the startup procedure
before starting the actual operating tests.
This procedure should be performed only by a service
technician or installer.
NOTE
: Each compartment has its own steam generator and control system and must be started
independently.
a.
Startup Procedure
1.
Check that the water supply line valves are open.
2.
Check that the main manual gas valve is open.
3.
Open the steamer door. Check for proper installation of the drain screen, slide racks, and door
gasket assembly. Be sure the drain is not blocked. Shut the steamer door.
4.
Refer to electrical layout, Figure 2-9, and spec sheet. Be sure the main power switch is in the
OFF position. Verify installation of the proper size fuses or circuit breakers.