4.2.3 Repeat the above
operations to install other ECO-
Rails. The ECO-Rails installation
are completed as shown in
Figure 7.
(
Figure 7
)
4.3 PV Module Installation
4.3.1 According to engineering
drawing, place the first PV module
on appropriate position. Slide the
End Clamp and Inter Clamp tightly
against the PV module and fasten
them as shown in Figure 8.
Recommended torque for M8
bolts is 18 ~20 Nm.
(
Figure 8
)
4.3.2 Repeat above operation to
install other PV modules one by
one. The whole system is
completed as shown in Figure 9.
(
Figure 9
)