background image

 

3/9 

 

 

 

Clenergy China    

 

 

 

 

 

Tel86 592 311 0088 

999-1009 Min'an Rd, Huoju Hi-tech Ind. Dev. Zone 

 

 

Fac86 592 599 5028 

Xiang'an District 361101, Xiamen, Fujian, China 

 

 

[email protected] 

 

3.

 

 System Overview 

3.1 Overview of SolarTripod Lite  

 

 

 

3.2 Stainless Steel Fastener Installation Precautions

 

Improper operation may lead to bolt and nut deadlock. Follow the steps below to 
reduce this risk. 

 

 

 

1.  End Clamp 

2.  Support for SolarTripod 

Lite 

3.  Inter Clamp 

 

 

 

4.  ECO-Rail 

5.  Splice for ECO-Rail 

6.  Rail Clamp for ECO-Rail 

with grounding/earthing 
pins                                                                                                                                                                                                                                                                                                                    

2

 

4

 

6

 

5

 

Содержание PV-ezRack SolarTripod Lite

Страница 1: ...one Facsimile 86 592 599 5028 Xiang an District 361101 Xiamen Fujian China sales clenergy com cn PV ezRack SolarTripod Lite AU Version Installation Guide V1 1 NO PZ35 IM02 10 Content 1 Introduction 1...

Страница 2: ...nual thoroughly prior to installing PV ezRack SolarTripod Lite This manual provides supporting documentation for building permit applications relating to PV ezRack SolarTripod Lite When installed in a...

Страница 3: ...strict 361101 Xiamen Fujian China sales clenergy com cn 2 Tools Allen Key 6 8 mm Adjustable Spanner Torque Wrench 5m Tape Marker Pen String Note the above tools are used for mounting system installati...

Страница 4: ...nergy com cn 3 System Overview 3 1 Overview of SolarTripod Lite 3 2 Stainless Steel Fastener Installation Precautions Improper operation may lead to bolt and nut deadlock Follow the steps below to red...

Страница 5: ...oid using electric tools for final tightening 5 Avoid working at high temperatures 3 Safe Torques Please refer to the safe torques defined in this guide as shown below If power tools are required Clen...

Страница 6: ...egardless of the component size If you need to perform any on site modifications or alteration of the system in a way that differs from the construction drawing please provide marked up drawings sketc...

Страница 7: ...Remark 1 In the fixation scheme of the tripod bolts for fixing Base support can be embedded ones or expansion ones and its type and length shall be determined according to actual situation of project...

Страница 8: ...d installation faces of Upper Support are on the surface of same height Fasten all bolts tightly as shown in Figure 4 Recommended torque 18 20 N m for M8 bolt Figure 4 4 2 ECO Rail Installation 4 2 1...

Страница 9: ...installation are completed as shown in Figure 7 Figure 7 4 3 PV Module Installation 4 3 1 According to engineering drawing place the first PV module on appropriate position Slide the End Clamp and In...

Страница 10: ...aamanet org are not followed by Purchaser This Warranty does not cover damage to the Product that occurs during its shipment storage or installation This Warranty shall be VOID if installation of the...

Отзывы: