4.1.3 Repeat the above steps to
fix other Supports for Tripod Lite
of the same unit. Adjust
installation position of all
Supports to guarantee lower end
faces of Upper Support are on
the same line and installation
faces of Upper Support are on
the surface of same height.
Fasten all bolts tightly as shown
in Figure 4.
Recommended torque :
18-20 N·m. for M8 bolt
(
Figure 4
)
4.2 ECO-Rail Installation
4.2.1 Use Splice for ECO-Rail to
connect ECO-Rails and fasten
with M8 bolt assemblies tightly
as shown in Figure 5.
Recommended torque :
18-20 N·m. for M8 bolt
(
Figure 5
)
4.2.2 Use Rail Clamp for ECO-
Rail or with grounding/earthing
pins to fix the connected ECO-
Rail on the Upper Support of
Support and fasten bolts tightly
as shown in Figure 6.
Recommended torque:
18-20 N·m for M8 bolt
(
Figure 6
)