Note:
Watch out the position that the
bolt attached to the M-module,
two legs of M-module should
be open as shown in the
figure26.
4.6.3 Fix the rest of PV-
Module
according
to
the
sequence: from low to up,
from left to right. Make the
side faces
of PV-Module
tightly against Clamps, as
shown
in
Figure27.
Any
adjacent side face of PV-
Module keep the distance of
20mm, as shown in Figure27.
Note:
Put an Inter Clamp II at each
side of PV-Module to keep the
distance of 20mm and take
them away after the PV-
Module being fixed.
4.5.4 Now the installation of a
single array is completed as
shown in Figure 28.
Please recheck all bolts, and
fasten them tightly
Figure26
20mm
Figure 28
Figure 27