15
/
18
No. 999-1009, Min’an Avenue, Xiang’an 1/10 Duerdin ,
Xiamen China 361006 Clayton VIC 3168
Tel: +86-592-5781288 Tel: +61-3-90176688
Fax: +86-592-5782298 Fax: +61-3-90176668
Email:
Email:
Website:
www.clenergy.com.cn
Website: ww2w.clenergy.com.au
4.4.2 Click one lower side of
TM Rail on the East-West
Adjustable Bracket and fasten
with Rail Clamp. And fasten
the other lower side of TM
Rail with Rail Clamp
as shown in Figure 21.
4.4.3 Place the TM Rail one by
one on the planned positions.
4.4.4 Repeat above
operations, install other TM
Rails. Ensure the end faces of
Rails are aligned and all Rails
are at same height as shown
in Figure 22. Now fasten all
bolts tightly.
Recommended Torque:
M8:
18~20 N•m
Recommended Torque:
M12: 50~55
N•m
Figure 21
Figure 22