background image

 

 

16

 /

18 

No. 999-1009, Min’an Avenue, Xiang’an                                                                                                     1/10 Duerdin , 

Xiamen China 361006                                                                                                                             Clayton VIC 3168 

Tel: +86-592-5781288                                                                                                                      Tel: +61-3-90176688 

Fax: +86-592-5782298                                                                                                                    Fax: +61-3-90176668 

Email: 

[email protected]

                                                                                              Email: 

[email protected]

 

Website: 

www.clenergy.com.cn

                                                                                            Website: ww2w.clenergy.com.au

 

4.5 Angle Al Installation (Optional Parts)  

 

4.5.1 According engineer plan, 

lightly lock Connector for 

Rectangular Tube on the rear 

leg of Support as shown in 

Figure 23. Insert M8*30 

through the hole on Angel AL. 

Lightly lock another Connector 

for Rectangular Tube on the 

next span rear leg and adjust 

its position to lock the Angel 

AL and make it be in tension 

status. Use Self-tapping screw 

ST6.3*22 to fix Connector for 

Rectangular Tube and fasten 

all bolts as shown in Figure 24. 

 

 

Note: 

The  quantity,  position  and  tilt 

direction  need  to  comply  with 

the  requirement  on  engineer 

drawings. 

Recommended Torque:  

M8: 

18~20 N•m

 

 

 

Figure23

 

 

Figure24

 

 

 

Содержание PV-ezRack SolarTerrace Eco with TM Rail

Страница 1: ...dated on 2018 04 PV ezRack SolarTerrace Eco with TM Rail Installation Guide V1 1 NO PZ02A IM03 11 Content 1 Product Introduction 1 2 Tools Components 2 3 System Overview 6 4 Installation Instructions...

Страница 2: ...y The manual provides the following content 1 simple introduction of installation 2 product installation specification Please use it according to the installation instruction manual which complies wit...

Страница 3: ...www clenergy com cn Website ww2w clenergy com au 2 Tools Components 2 1 Tools Tools Allen Key 6mm M8 Hexagon Socket Screw Socket Wrench M8 M12 Torque Wrench Electric Drill 5m Tape Marker String Total...

Страница 4: ...ICII M Inter Clamp II R TM90 L TM Rail SP LS90 M Splice for TM Rail S STEco W Support Pre assembled W shape ER AA 50 3560 8 Angle AL CO RT 55 50 Connector for Rectangular Tube GS xx Ground Screw ER HB...

Страница 5: ...l to fasteners prior tightening to avoid galling or seizing in the threads 2 General installation instructions 1 Apply force to fasteners in the direction of thread 2 Apply force uniformly to maintain...

Страница 6: ...86 592 5781288 Tel 61 3 90176688 Fax 86 592 5782298 Fax 61 3 90176668 Email sales clenergy com cn Email sales clenergy com au Website www clenergy com cn Website ww2w clenergy com au Notes Tighten th...

Страница 7: ...clenergy com au Website www clenergy com cn Website ww2w clenergy com au 3 System Overview 3 1 Composition 1 End Clamp with M module 2 Inter Clamp II with M module 3 TM Rail 4 Splice for LS Rail 5 Pr...

Страница 8: ...92 5782298 Fax 61 3 90176668 Email sales clenergy com cn Email sales clenergy com au Website www clenergy com cn Website ww2w clenergy com au 3 2 Installation Planning Note Specific size refers to pro...

Страница 9: ...information such as piling depth column span etc If you have any questions please contact and consult the customer service 4 1 2 According to the installation planning use Total station or any instrum...

Страница 10: ...all aligned 4 2 2 To different engineer there are 3 types of Pre assembled Support W shape Before installation it looks as shown Figure3 Unfold the Rectangular Tubes as shown in Figure 4 Unlock the M...

Страница 11: ...au N shape Before installation it looks as shown Figure7 Unfold the Rectangular Tubes as shown in Figure8 Unlock the M12 85 Bolt from the free end Rectangular Tubes and insert it into the Slot U Shape...

Страница 12: ...efore installation it looks as shown Figure11 Unfold the Rectangular Tubes as shown in Figure12 Unlock the M12 85 Bolt from the Slot U Shape Joint Insert the free end Rectangular Tube into the Slot U...

Страница 13: ...om au 4 2 3 Put the unfolded Pre assembled Support on frank plates of Ground Screws and lock the L anchor Plates with frank plates with M16 bolts The up down adjustable range of Front Rear leg is 20mm...

Страница 14: ...ions to install other Pre assembled Support Ensure all the Two Groove Square Girders of Pre assembled Support are aligned and all Pre assembled Support are parallel to each other Unlock M16 50 or M12...

Страница 15: ...e positions of all East West Adjustable Brackets and fasten with M8 Bolts assembly Recommend Torque for Bolts M8 18 20 N m Figure19 4 4 Rail Installation 4 4 1 Before fix TM Rails on the Support splic...

Страница 16: ...ne lower side of TM Rail on the East West Adjustable Bracket and fasten with Rail Clamp And fasten the other lower side of TM Rail with Rail Clamp as shown in Figure 21 4 4 3 Place the TM Rail one by...

Страница 17: ...tly lock Connector for Rectangular Tube on the rear leg of Support as shown in Figure 23 Insert M8 30 through the hole on Angel AL Lightly lock another Connector for Rectangular Tube on the next span...

Страница 18: ...tion 4 6 1 Tilt the Clamps with M module and click the lower side of M module into the channel of the Rail first then press the other side of M module into the channel as shown in Figure25 4 6 2 It is...

Страница 19: ...pen as shown in the figure26 4 6 3 Fix the rest of PV Module according to the sequence from low to up from left to right Make the side faces of PV Module tightly against Clamps as shown in Figure27 An...

Отзывы: