4.3.5 After fasten the Module Clamp
40, lay PV Module slightly down on
the preassembled part of Support
Leg in the rear row as shown in
Figure15.
4.3.6 Adjust Module Frame Back
Mounting
Clip
along
fore-aft
direction; ensure the frame of PV
module will be held by Mounting Clip
as shown in Figure 16 and 17.
4.3.7 Fasten Bolts M8*35 and
Square Neck Bolts M8*45 tightly in
order.
Recommended torque
:
10-12N·m for Bolts M8*35
Recommended torque
:
18-20N·m for Square Neck Bolts M8
4.3.8 Repeat above operations to
install the rest PV modules as shown
in Figure18.