background image

 

10 / 11 

No. 999-1009, Min’an Avenue, Xiang’an                                                                                                                              18/20 Duerdin , 

Xiamen China 361006                                                                                                                                                            Clayton VIC 3168 
Tel: +86-592-5781288                                                                                                                                                  Tel: +61-3-90176688 

Fax: +86-592-5782298                                                                                                                                                Fax: +61-3-90176668 
Email: 

[email protected]

                                                                                                                  Email: 

[email protected]

 

Website: 

www.clenergy.com.cn

                                                                                                              Website: www.clenergy.com.au 

4.3.5 After fasten the Module Clamp 

40,  lay  PV  Module  slightly  down  on 

the  preassembled  part  of  Support 

Leg  in  the  rear  row  as  shown  in 

Figure15.   

 

 

 

 

 

4.3.6  Adjust  Module  Frame  Back 

Mounting 

Clip 

along 

fore-aft 

direction;  ensure  the  frame  of  PV 

module will be held by Mounting Clip 

as shown in Figure 16 and 17.   

 

 

4.3.7  Fasten  Bolts  M8*35  and 

Square  Neck  Bolts  M8*45  tightly  in 

order.   

Recommended torque

       

10-12N·m for Bolts M8*35   

Recommended torque

       

18-20N·m for Square Neck Bolts M8 

 

 

 

 

4.3.8  Repeat  above  operations  to 

install the rest PV modules as shown 

in Figure18. 

 

 

 

 

 

 

 

 

 

Figure 15 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 16                                  Figure 17 

 

 

 

 

 

 

 

 

 

 

 

 

           

Figure 18 

 

Содержание PV-ezRack SolarBase

Страница 1: ...PV ezRack SolarBase Low Ballast Flat Roof System Installation Guide V1 4 NO PZ30 IM01 14 Content 1 Introduction 1 2 Tools Components 2 3 System overview 3 4 Installation Instructions 6...

Страница 2: ...h reduces cost and improves efficiency during installation Please review this manual thoroughly prior to installing PV ezRack SolarBase This manual provides supporting documentation for building permi...

Страница 3: ...Components 2 1 Tools 6mm inside hexagonal spanner Electric tool 5m tape Marking pen Torque spanner string Socket spanner Note tools in the figure are only used for rack system not included in supply s...

Страница 4: ...el 61 3 90176688 Fax 86 592 5782298 Fax 61 3 90176668 Email sales clenergy com cn Email sales clenergy com au Website www clenergy com cn Website www clenergy com au 3 System overview 3 1 Overview of...

Страница 5: ...8 Fax 61 3 90176668 Email sales clenergy com cn Email sales clenergy com au Website www clenergy com cn Website www clenergy com au a Installation planning Note Red circles highlight installation of M...

Страница 6: ...seizing in the threads 2 General installation instructions 1 Apply force to fasteners in the direction of thread 2 Apply force uniformly to maintain required torque 3 Professional tools and tool belt...

Страница 7: ...rom those shown in this guide The installation process detailed in this instruction guide remains the same regardless of the component size In case you need to do any on site modifications or alterati...

Страница 8: ...shown in Figure 3 Figure 3 4 2 Install Wind Deflector and ballast optional parts 4 2 1 Fix Wind Deflector on the pre assembled bolts of Support Leg team and make it press against Support Leg and make...

Страница 9: ...eflector tightly as shown in Figures 7 and 8 Recommended torque 8 9 N m for U bolt M8 58 4 2 4 After Wind Deflector and Ballast bar are installed load ballast orderly Ballast height should be no more...

Страница 10: ...le and guarantee frame of PV module attach to the rotating part of Support Leg Pay attention to installation direction of PV module as shown in Figure 11 4 3 3 Fasten the frame of PV module and Suppor...

Страница 11: ...htly down on the preassembled part of Support Leg in the rear row as shown in Figure15 4 3 6 Adjust Module Frame Back Mounting Clip along fore aft direction ensure the frame of PV module will be held...

Страница 12: ...www clenergy com au 4 4 Install Grounding Lug 4 4 1 Fix the Grounding Lug on Ballast Bar of the longest row along vertical direction as shown in Figure 19 install one Grounding Lug per row and fasten...