background image

 

9 / 11 

No. 999-1009, Min’an Avenue, Xiang’an                                                                                                                              18/20 Duerdin , 

Xiamen China 361006                                                                                                                                                            Clayton VIC 3168 
Tel: +86-592-5781288                                                                                                                                                  Tel: +61-3-90176688 

Fax: +86-592-5782298                                                                                                                                                Fax: +61-3-90176668 
Email: 

[email protected]

                                                                                                                  Email: 

[email protected]

 

Website: 

www.clenergy.com.cn

                                                                                                              Website: www.clenergy.com.au 

4.3.2  Place  PV  module  smoothly  on 

Support 

Leg. 

According 

to 

installation  planning,  adjust  left  and 

right  positions  of  PV  module  and 

guarantee  frame  of  PV  module 

attach to the rotating part of Support 

Leg.  Pay  attention  to  installation 

direction  of  PV  module  as  shown  in 

Figure 11.   

 

 

 

 

 

 

 

 

4.3.3 Fasten the frame of PV module 

and Support Leg with Module Clamp 

40 as shown in Figure 12. 

 

 

 

 

4.3.4  Adjust  Module  Clamp  40  to 

ensure that 

it’s located in the middle 

of  preassembled  parts  of  Support 

Leg  and  fasten  tightly.  While  fasten 

the  Bolts  M8*25,  hold  the  Module 

Clamp 40 to ensure it unmovable, as 

shown in Figure 13 and 14.   

 

Recommended torque: 

18-20N.m for Bolts M8*25 

 

 

 

 

 

 

               

       

 

 

Figure 11 

 

 

                 

    Figure 12                    Figure 13 

 

 

 

 

 

 

 

 

               

                  Figure 14 

 

Correct direction 

Wrong direction 

Содержание PV-ezRack SolarBase

Страница 1: ...PV ezRack SolarBase Low Ballast Flat Roof System Installation Guide V1 4 NO PZ30 IM01 14 Content 1 Introduction 1 2 Tools Components 2 3 System overview 3 4 Installation Instructions 6...

Страница 2: ...h reduces cost and improves efficiency during installation Please review this manual thoroughly prior to installing PV ezRack SolarBase This manual provides supporting documentation for building permi...

Страница 3: ...Components 2 1 Tools 6mm inside hexagonal spanner Electric tool 5m tape Marking pen Torque spanner string Socket spanner Note tools in the figure are only used for rack system not included in supply s...

Страница 4: ...el 61 3 90176688 Fax 86 592 5782298 Fax 61 3 90176668 Email sales clenergy com cn Email sales clenergy com au Website www clenergy com cn Website www clenergy com au 3 System overview 3 1 Overview of...

Страница 5: ...8 Fax 61 3 90176668 Email sales clenergy com cn Email sales clenergy com au Website www clenergy com cn Website www clenergy com au a Installation planning Note Red circles highlight installation of M...

Страница 6: ...seizing in the threads 2 General installation instructions 1 Apply force to fasteners in the direction of thread 2 Apply force uniformly to maintain required torque 3 Professional tools and tool belt...

Страница 7: ...rom those shown in this guide The installation process detailed in this instruction guide remains the same regardless of the component size In case you need to do any on site modifications or alterati...

Страница 8: ...shown in Figure 3 Figure 3 4 2 Install Wind Deflector and ballast optional parts 4 2 1 Fix Wind Deflector on the pre assembled bolts of Support Leg team and make it press against Support Leg and make...

Страница 9: ...eflector tightly as shown in Figures 7 and 8 Recommended torque 8 9 N m for U bolt M8 58 4 2 4 After Wind Deflector and Ballast bar are installed load ballast orderly Ballast height should be no more...

Страница 10: ...le and guarantee frame of PV module attach to the rotating part of Support Leg Pay attention to installation direction of PV module as shown in Figure 11 4 3 3 Fasten the frame of PV module and Suppor...

Страница 11: ...htly down on the preassembled part of Support Leg in the rear row as shown in Figure15 4 3 6 Adjust Module Frame Back Mounting Clip along fore aft direction ensure the frame of PV module will be held...

Страница 12: ...www clenergy com au 4 4 Install Grounding Lug 4 4 1 Fix the Grounding Lug on Ballast Bar of the longest row along vertical direction as shown in Figure 19 install one Grounding Lug per row and fasten...

Отзывы: