Unit 1, 10 Duerdin St, Clayton VIC 3168, Australia
Tel: +61 3 9239 8088 Fax: +61 3 9239 8024
E-mail: [email protected] www.clenergy.com.au
8
page
of 15
Installation Guide_PostMount 2-A for XL Panels_AU_V1.1 (January 2021)
Installation Instruction
4.4 Rectangular Tube- Landscape Installation
4.4.1 Fix the 2 pcs Rectangular Tube-
Landscapes at Rectangular Tube-Master with
2 pcs U-bolts, 4 pcs M10 nuts , 4 pcs spring
washers 10, and 4 pcs plain washers 10. Do
not fasten the Nut until 2 Rectangular Tube-
Landscapes aligned.
Note: Adjust the Rectangular Tube-
Landscapes until the dimension D1=D2.
Recommended torque for M10 bolts is 35~40
N·m.
4.4.2 Preassemble the Cross Connection Clamp
at the Rectangular Tube-Master with M8*70 hex
bolts, plain washer 8, spring washer 8, and M8
nut as shown in the figure on the right.
Note: Do not fasten the M8*70 hex bolt in
order to make other clamp fit well.