background image

Unit 1, 10 Duerdin St, Clayton VIC 3168, Australia
Tel: +61 3 9239 8088 Fax: +61 3 9239 8024
E-mail: [email protected]  www.clenergy.com.au 

11

page 

of 15

Installation Guide_PostMount 2-A for XL Panels_AU_V1.1 (January 2021)

There are three solutions for Grounding Lug 
installation.

-Solution 1  Fix the Grounding Lug at the end of Rail 
as shown in the figure on the right.

-Solution 2  Fix the Grounding Lug at the Rail where 
just under the PV Module as shown in the figure on 
the right.

-Solution 3  Fix the Grounding Lug at the side 
channel of Rail as shown in the figure on the right.

Installation Instruction

Содержание PV-ezRack PostMount 2-A

Страница 1: ...PostMount 2 A for XL Panels Installation Guide Code Compliant Planning and Installation Guide V1 1 Complying with AS NZS1170 2 2011 ADMT 4 2016...

Страница 2: ...rking on the ground please comply with the appropriate occupational health and safety regulations Please also pay attention to other relevant regulations in your local region Please check that you are...

Страница 3: ...2021 2 2 Components C U 30 46 G Universal Clampx12 ER R ECO 2100 ECO Rail length 2100mmx4 ER AP PM2 A LP PM2 A Kitx1 ER P 102 2600 Pipex1 Components SC PM2 3 4 A Steel Capx1 ER RT 70 394 Adjustable Tu...

Страница 4: ...of PV ezRack PostMount 2 A for XL Panels Side view drawing of PV ezRack PostMount 2 A for XL Panels is shown below The panels tilt angle and embedment depth below are for reference only Please refer...

Страница 5: ...1 3 2 Precautionary Measures for Stainless Steel Fastener Installation Improper operation may lead to the deadlock of bolts and nuts Follow the steps below to reduce this risk 3 2 1 Reduce the frictio...

Страница 6: ...adlock If deadlock occurs and you need to cut fasteners please make sure that there is no load on the fastener before you cut it Avoid damaging the anodized or galvanized surfaces 3 3 Installation Dim...

Страница 7: ...n the position of the pipe The allowed vertical tolerance is 2 Keep the axle of the 2 16 holes parallel to East West keep the vertical angle deviation within 5 For more than one system on one site mai...

Страница 8: ...he mark 4 3 3 Fix the Adjustable Tube at Steel Cap Assembly with M14 120 hex bolt M14 nut plain washer 14 and spring washer 14 See the mark Realized the angle adjustment by position the bolt in the di...

Страница 9: ...tangular Tube Master with 2 pcs U bolts 4 pcs M10 nuts 4 pcs spring washers 10 and 4 pcs plain washers 10 Do not fasten the Nut until 2 Rectangular Tube Landscapes aligned Note Adjust the Rectangular...

Страница 10: ...ter and then fasten the M8 70 bolt Recommended torque for M8 bolts is 18 20 N m Note ECO Rail of 2100 mm is a standard length in this system which can be suitable for up to 1002 mm wide panel If the p...

Страница 11: ...de of the universal clamp close to the wide side of the Universal Clamp Buckle it can be used as inter clamp as shown in the figure below The Universal Clamp can be directly rotated to the position of...

Страница 12: ..._V1 1 January 2021 There are three solutions for Grounding Lug installation Solution 1 Fix the Grounding Lug at the end of Rail as shown in the figure on the right Solution 2 Fix the Grounding Lug at...

Страница 13: ...St Clayton VIC 3168 Australia Tel 61 3 9239 8088 Fax 61 3 9239 8024 E mail tech clenergy com au www clenergy com au 12 page of 15 Installation Guide_PostMount 2 A for XL Panels_AU_V1 1 January 2021 Ce...

Страница 14: ...rt number Description ER R ECO 2100 PV ezRack ECO Rail 2100mm ER RT 50 1400 PV ezRack PM2 A PM3 A Rectangular Tube Landscape L1400 50 50 T4 ER RT 70 1300 PV ezRack PM2 A Rectangular Tube Master L1300...

Страница 15: ...EF CL 10127 S Internal REF 00140 Max Solar Panel Length 2 1m width 1 1m Yield Strength Steel 300 MPa Aluminium 240 MPa Maximum tilt angle options refer to tables Dimension as shown here on the picture...

Страница 16: ...sands Notes 1 Terrain Category 2 TC2 refers to open terrain including grassland with well scattered obstructions having heights generally from 1 5m to 5m with no more than two obstructions per hectar...

Страница 17: ...f the soil report Construction is to be carried out strictly on accordance with the instruction manual This work was designed in accordance with the provisions of Australian Building Regulations and i...

Страница 18: ...ation Guide_PostMount 2 A for XL Panels_AU_V1 1 January 2021 ClenergyClub ClenergyAUS Offices Australia China Japan Germany Thailand Philippines Clenergy_global ClenergyClub Clenergy www clenergy com...

Страница 19: ...s to determine the extent of the problem Details are provided below as to the extent of your Warranty coverage and any exclusions that may apply Please read these provisions carefully to ensure you r...

Страница 20: ...ural ageing process The result may even be beneficial to the longevity of the Product as the oxidization can provide additional protection against degradation by pollution and atmospheric corrosion Th...

Страница 21: ...5th Floor 23 Yamashita cho Yokohama 231 0023 Japan Tel 81 45 228 8226 Fax 81 45 228 8316 E mail sales clenergy co jp www clenergy jp Clenergy Philippines 145 Yakal St San Antonio village Makati City P...

Отзывы: