Unit 1, 10 Duerdin St, Clayton VIC 3168, Australia
Tel: +61 3 9239 8088 Fax: +61 3 9239 8024
E-mail: [email protected] www.clenergy.com.au
11
page
of 15
Installation Guide_PostMount 2-A for XL Panels_AU_V1.1 (January 2021)
There are three solutions for Grounding Lug
installation.
-Solution 1 Fix the Grounding Lug at the end of Rail
as shown in the figure on the right.
-Solution 2 Fix the Grounding Lug at the Rail where
just under the PV Module as shown in the figure on
the right.
-Solution 3 Fix the Grounding Lug at the side
channel of Rail as shown in the figure on the right.
Installation Instruction