Installation Instruction
4. Installation Instruction
4.1 Pipe Installation
Dig a hole with the diameter of 300mm .
Place the pole into the middle of the hole and fill it
with concrete (min 25 MPa strength). Maintain the
position of the post. The allowed vertical tolerance
is ±2°.Keep the axle of the 2- Ø22 holes parallel to
East-West;keep the vertical angle deviation within
±5°.For more than one system on one site maintain
all the axles of 2- Ø22 holes aligned.
4.2 Steel Cap Installation
Connect the Pipe to the corrugated washer and Steel Cap Assembly with M20*210 hexagonal
bolt, spring washer 20, M20 nut .
Combine two Steel Caps with M20*160 hexagonal bolt, spring washer 20, M20 hex nut.
Note
:
1. Do not fasten the Bolt prior to complete the assembly of PM-A Rectangular Tube-Master.
2. Keep all the Bolt head aligned.