There are three solutions for Grounding Lug
installation.
-Solution 1 Fix the Grounding Lug at the end of Rail
as shown in the figure on the right.
-Solution 2 Fix the Grounding Lug at the Rail where
just under the PV Module as shown in the figure on
the right.
-Solution 3 Fix the Grounding Lug at the side
channel of Rail as shown in the figure on the right.
Installation Instruction