4.6 PV Module Installation
4.6.1 Fix the PV panel to Rail, via Universal Inter
Clamps and End Clamps step by step until all the
panels complete.
Recommended torque for M8 bolts is 18~20 N·m
Note: The Universal Clamp can be used both as
a End Clamp and a Inter Clamp, and the height
can be adjusted from 30 to 46 mm.
When the side of the Universal Clamp close the
narrow side of the Universal Clamp Buckle, it
can be used as End Clamp, and when the side
of the Universal Clamp close the wide side of the
Universal Clamp Buckle, it can be used as Inter
Clamp, as shown in the figure on the right. The
Universal Clamp can be directly rotated to the
position of required End or Inter Clamp.
Recommended torque for M8 bolts when it is Inter
Clamp is 18~20 N·m
Recommended torque for M8 bolts when it is End
Clamp is 13~14 N·m
Inter clamp
90°
End clamp
4.6.2 Apply one pre-assembled Grounding Lug per Rail. Click the Grounding Lug into to the rail
channel and insert the Copper Wire. (the maximum size is 4 mm
2
or similar) Fasten the bolt M6*14 with
5~6 N.m and the bolt M8*25 with 16~20 N.m .Copper Pipe will be supplied for the case that using
small size Copper Wire.