Page 11
TM12-1103-LG1
08/25/2017
mPro400GC-I global controller
5 Initial operation:
Putting into use
Danger of hands being crushed.
→ Always use a torque reaction bar for
applications in a restricted space or high
torque: inline tools (4 Nm), pistol grip tools
(10 Nm), right angle tools (60 Nm).
Performing a fastener rundown
The 48C series nutrunners have been configured by Apex
Tool Group. A setting for your specfic fastener joint must
only be made with the nutrunner controller by qualified
personnel
1
, The initial operation can vary depending on the
type and programming of the nutrunner controller. Refer to
the nutrunner controller Programming Manual.
→ Make sure the tool cable is securely attached to the tool
and controller.
→ Make sure the controller is powered on and properly
programmed (refer to the controller manuals).
→ Make sure the reverse mechanism is in the correct
position.
→ Place the socket or bit on the application and depress the
switch actuator to start the rundown.
→ When the nutrunner shuts off, release the switch actuator.
→ Remove the nutrunner from the application.
Maintenance
Implement a comprehensive safety maintenance program
to provide regular inspection for all phases of tool operation
and air supply equipment.
Daily:
→ Visual inspection of all cables and connections
→ Visual inspection of all external tool components
→ Check the tool for excessive vibration or unusual noises
Approximately 100,000 Rundowns:
→ Inspect the tool cable for damage or wear
→ Inspect the tool cable connection for a secure fit
→ Inspect the output spindle for damage or wear
→ Verify the maximum free speed
Approximately 500,000 Rundowns:
→ Disassemble the tool and inspect all parts for damage or
wear and replace as necessary
→ Clean and lubricate the angle head, gearing, and motor
bearings
→ If equipped; recalibrate the transducer
Approximately 1,000,000 Rundowns:
→ Disassemble the tool and inspect all parts for damage or
wear and replace as necessary
→ Clean and lubricate the angle head, gearing, and motor
bearings
→ If equipped; recalibrate the transducer
Lubricants
Application of the assembly tool determines how frequently
it is greased. All gearing should receive a generous amount
of grease during each service interval.
-------------------------------------------------------------------------------
1. Qualified personnel are those who can recognize possible
hazards and institute the appropriate safety measures due to their
professional training, knowl- edge, and experience as well as their
understanding of the relevant conditions pertaining to the work to
be done. Qualified personnel must observe the rules
EN
EN
Feet
Meters
Description
301866-XXX *
3 - 49
1 - 15 Tool Cable (1)
301904-XXX *
3 - 49
1 - 15 Swivel Cable: Inline (1)
301903-XXX *
3 - 49
1 - 15 Swivel Cable: Right Angle (1)
301877-XXX
3 - 66
1 - 20 Extension Cable
961259-XXX **
3 - 66
1 - 20 Tool Cable (1)
961250-XXX **
3 - 66
1 - 20 Tool Cable (2)
961251-XXX **
3 - 66
1 - 20 Swivel Cable: Inline (2)
961252-XXX **
3 - 66
1 - 20 Swivel Cable: Right Angle (2)
961249-XXX **
3 - 66
1 - 20 Extension Cable
** Note: 20M length does not require a transformer.
(1) Standard Durability
(2) High Durability
* Note: 3 ft. and 6 ft. (1M and 2M) cables must be used with
301877 Extension Cable.
Tool Cables
48C series
Cable Length
Non European Union Cables - Air-LB Connector
European Union Cables - Air-LB Connector
m-Pro-400GC-I
Series
Tool
Cable
48CA Right Angle
Nutrunner Shown
Application
Spindle Rotation
Torque
Reaction
Part No.
Packaged
Grease
540395
2 oz. (0.06 kg)
Magnalube-G
513156
16 oz. (0.45 kg)
Magnalube-G
541444
2 oz. (0.06 kg)
Rheolube 363AX-1
541445
16 oz. (0.45 kg)
Rheolube 363AX-1
Содержание 48CAE105AH4
Страница 2: ......
Страница 77: ...Page 77 TM12 1103 LG1 08 25 2017 ZH OK NOK Apex Tool Group LLC Apex Tool Group LLC 1 CE EAC...
Страница 78: ...Page 78 TM12 1103 LG1 08 25 2017 ZH 1 2 1 1 3 A 4 5 6 7 8 ElektroG BattG 320 V 1...
Страница 82: ...Page 82 TM12 1103 LG1 08 25 2017 ZH 2 3 LED LED 4 1 2 3 4 LED 5 6 7 7 6 5 4 3 2 1 2 3 5 6 7 4 LED 1...
Страница 84: ...Page 84 TM12 1103 LG1 08 25 2017 ZH 6 RPM 0 rpm 10 LED x mPro40 0GC Air LB Matrix 1 2...
Страница 90: ...Page 90 TM12 1103 LG1 08 25 2017 JA 1 2 APEX 1 APEX 1 3 APEX EMC A 4 5 6 7 8 ElektroG Battg 320 VDC 1...
Страница 94: ...Page 94 TM12 1103 LG1 08 25 2017 JA 2 3 LED LED 4 7 6 5 4 3 2 1 1 2 3 5 6 7 4 LED 1 2 3 4 LED 5 6 7...
Страница 100: ...Page 100 TM12 1103 LG1 08 25 2017 Blank Page Leere Seite Page blanche P gina en blanco P gina em branco Pagina vuota...
Страница 101: ...Page 101 TM12 1103 LG1 08 25 2017 KO OK NOK Apex Tool Group LLC Apex Tool Group LLC 1 CE EurAsian...
Страница 106: ...Page 106 TM12 1103 LG1 08 25 2017 2 3 LED LED 4 1 2 3 4 LED 5 6 7 7 6 5 4 3 2 1 1 2 3 5 6 7 4 LED OK NOK Enable KO...
Страница 126: ......
Страница 127: ......