5.12 — Recommended Maintenance Schedule
TABLE 5-1.
Maintenance Schedule
Item
Service By
Remarks
DAILY
Gauges, Monitors, Indicators
Operator
Make visual inspection and record readings in log.
Instrument & Equipment Settings
Operator
Make visual check against recommended specifications.
Low Water, Fuel Cutoff & Alarms
Operator
Refer to instructions.
WEEKLY
Firing Rate Control
Operator
Verify factory settings.
Igniter
Operator
Make visual inspection. Check flame signal strength.
Main Fuel Valves
Operator
Open limit switch. Make audible and visual check. Check valve
position indicators, and check fuel meters.
Flame Failure Controls
Operator
Close manual fuel supply valve(s). Check safety shutdown
timing. Record in log.
Flame Signal Strength Controls
Operator
Read and log the flame signal for main flame (Parameter 954).
Notify Service if readings are very high, very low, or fluctuating.
MONTHLY
Low Fan Pressure Interlock
Operator
Manually adjust until switch opens.
High & Low Gas Pressure
Interlocks
Operator
Refer to instructions. Manually adjust until switch opens.
Scanner
Operator
Check, inspect, and clean for soot buildup.
ANNUALLY
Combustion Test
Service Tech
Perform a complete combustion test. Adjust burner if
necessary. Read and log data.
Operating Controls
Service Tech
Refer to instructions.
Содержание ProFire Q Series
Страница 2: ......
Страница 18: ...Introduction 1 8 750 437 Q Series Full Modulation...
Страница 28: ...Installation 2 10 750 437 Q Series Full Modulation...
Страница 50: ...Operation 3 22 750 437 Q Series Full Modulation...
Страница 82: ...Troubleshooting 6 24 750 437 Q Series Full Modulation...
Страница 87: ......
Страница 88: ......