![CleaverBrooks Master Panel 8 Скачать руководство пользователя страница 50](http://html1.mh-extra.com/html/cleaverbrooks/master-panel-8/master-panel-8_operation-manual_2622087050.webp)
Section 4 — Troubleshooting
Master Panel 8
4-6
Part No. 750-375
If computer shows no reply, as below:
then there may be a problem with processor ethernet. Check I/P
address.
12.Using straight Ethernet cable connect computer to Ethernet
switch in master panel.
13.Repeat Steps 10 and 11. If there is no reply from the processor
the problem is with the Ethernet cable connection from the master
panel to the boiler.
C. LOADING PLC PROGRAM
To load a program to the processor requires the following:
• SD memory card (recommended: SanDisk SD card A-B
1784-SD1 1GB capacity; supplied with processor).
• USB SD card reader
• Lap Top computer
To proceed:
1. Insert USB reader with SD card into PC.
2. Locate logix.zip file on the computer drive and double click on it.
Содержание Master Panel 8
Страница 1: ...750 375 10 16 Master Panel 8 Eight Boiler Lead Lag Control Operation Manual...
Страница 4: ......
Страница 6: ......
Страница 7: ...www cleaverbrooks com Section 1 Overview A Features 1 2 B Components 1 2 C Specifications 1 4...
Страница 55: ...www cleaverbrooks com Section 5 Parts Master Panel 8 Parts List 5 3...
Страница 56: ...Section 5 Parts Master Panel 8 5 2 Part No 750 375...
Страница 58: ...Section 5 Parts Master Panel 8 5 4 Part No 750 375...
Страница 60: ...e mail info cleaverbrooks com Web Address http www cleaverbrooks com...