![CleaverBrooks Master Panel 8 Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/cleaverbrooks/master-panel-8/master-panel-8_operation-manual_2622087024.webp)
Section 2 — Operation
Master Panel 8
2-14
Part No. 750-375
Figure 2-12 System Configuration Screen
Boiler ID
— These buttons allow changing boiler name. To assign a
name to a boiler, touch Boiler ID display for the specific boiler. The
keypad display will appear. Type new boiler name (up to 8 characters)
and press enter key.
HAWK ICS
selection — indicates whether individual boilers use a
HAWK system. This can be any Hawk system (Hawk ICS Advanced;
Hawk 1000, 2000, or 4000). If system is a Hawk 2000 then both
Hawk ICS
and
Hawk 2000
must be selected as <Yes> to
communicate to the Master Panel.
Note: Some Master Panel options are unavailable for units
without HAWK controls.
Number of Boilers
— Selects number of boilers for lead/lag sequence.
Valid entry is 2 to 8.
Max Temp
(hot water) /
Max Press
(steam) — Selects maximum
design water temperature or steam pressure. Make sure that this
value agrees with the maximum design temperature/pressure for the
boiler. Valid entries for a hot water system are from 200
o
F (93.3
o
C)
to 450
o
F(232
o
C). Valid entries for a steam system are from 15 PSI
(1 Bar) to 500 PSI (34.4 Bar).
Remote Set Point/Outdoor Reset
— Select <Yes> to enable.
Содержание Master Panel 8
Страница 1: ...750 375 10 16 Master Panel 8 Eight Boiler Lead Lag Control Operation Manual...
Страница 4: ......
Страница 6: ......
Страница 7: ...www cleaverbrooks com Section 1 Overview A Features 1 2 B Components 1 2 C Specifications 1 4...
Страница 55: ...www cleaverbrooks com Section 5 Parts Master Panel 8 Parts List 5 3...
Страница 56: ...Section 5 Parts Master Panel 8 5 2 Part No 750 375...
Страница 58: ...Section 5 Parts Master Panel 8 5 4 Part No 750 375...
Страница 60: ...e mail info cleaverbrooks com Web Address http www cleaverbrooks com...