![CleaverBrooks CFC ClearFire Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/cleaverbrooks/cfc-clearfire/cfc-clearfire_user-manual_2622067011.webp)
Model CFC
ClearFire Commercial Boilers
11
Rev. 05-2012
Table B5-2. Metric Dimensions Model CFC Boiler
Boiler Size
ITEM
DIMENSIONS (mm)
500
750
1000
1500
1800
2500
3300
A
Overall Height
1824
1824
1923
2073
2073
2088
2159
B
Overall Width
820
820
930
1110
1110
1290
1557
C
Overall Depth
1240
1240
1590
1666
1666
1844
2192
D
Width Less Casing
681
681
790
970
970
1151
1410
E
Gas Connection to Top of Casing
206
206
241
318
259
239
254
F
Gas Connection to Floor
1618
1618
1681
1755
1814
1849
1905
G
Side of Casing to Gas Connection
58
58
109
86
132
119
130
H
Boiler Centerline to Air Inlet Centerline
102
102
102
124
180
180
180
I
Floor to Bottom of Base
262
262
262
262
262
262
262
J
Floor to Top of Stack Connection
472
472
460
485
485
531
544
K
Centerline to Centerline of Stack Stub
391
391
429
533
533
714
909
L
Rear of Boiler to Centerline of Stack Stub
137
137
191
206
206
218
254
M
Front of Boiler to Rear of Casing
986
986
1255
1257
1257
1435
1702
N
Control Panel Projection
104
104
104
104
104
104
109
O
Casing Height
1427
1427
1524
1661
1661
1661
1702
P
Air Vent Line Projection from Rear of Casing
198
198
185
206
206
221
119
Q
Floor to Centerline of Lower Return
495
495
498
526
541
569
612
R
Floor to Centerline of Upper Return
716
729
775
516
820
859
902
S
Floor to Centerline of Supply Connection
1379
1379
1427
1450
1427
1427
1501
T
Floor to Centerline of Air Vent
1521
1521
1582
1603
1603
1615
1687
AA
Boiler Adjustment Foot Height
64
64
64
64
64
64
64
Height Above Boiler for Burner Service
356
356
356
356
356
356
457
CONNECTIONS (inches)
U
Water Supply/Return, 150# RF Flg
2-1/2"
2-1/2"
2-1/2"
3"
4"
5"
5"
V
Boiler Air Vent, NPT
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
W
Electrical Conduit, left or right
1.6"
1.6"
1.6"
1.6"
1.6"
1.6"
1.6"
X
Boiler Drain, NPT
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
Y
Flue Gas Nominal OD, Left or Right option
6"
6"
8"
10"
12"
12"
12"
Z
Combustion Air Option
4"
4" OR 6"
4" OR 6"
6"
6"
6" OR 8"
8"
BB
Gas Connection, NPT
1
"1
"1
"1-1/2
"1-1/2
"1-1/2
"2"
CC
Condensate Drain, FPT
3/4
"3/4
"3/4
"3/4
"3/4
"3/4
"1"
Relief Valve outlet @ 125 # Setting
1
"1
"1
"1
"1
"1
"1"
Voltage Fan Motor
115/1/60
115/1/60
115/1/60
115/1/60
115/1/60
115/1/60
208-240/
3/60
Voltage Control Circuit
115/1/60
115/1/60
115/1/60
115/1/60
115/1/60
115/1/60
115/1/60
Содержание CFC ClearFire
Страница 9: ...Model CFC ClearFire Commercial Boilers 9 Rev 05 2012 Figure B5 6 Model CFC Dimensional Views I ...
Страница 64: ...Model CFC ClearFire Commercial Boilers 64 Rev 05 2012 Figure B5 54 Electrical Connections CFC 500 2500 ...
Страница 65: ...Model CFC ClearFire Commercial Boilers 65 Rev 05 2012 Figure B5 55 Electrical Connections CFC 3300 ...
Страница 66: ...Model CFC ClearFire Commercial Boilers 66 Rev 05 2012 Figure B5 56 CFC Rear Connections ...
Страница 70: ...Model CFC ClearFire Commercial Boilers 70 Rev 05 2012 ...