![CleaverBrooks CBLE Скачать руководство пользователя страница 30](http://html1.mh-extra.com/html/cleaverbrooks/cble/cble_operation-and-maintenance-manual_2622062030.webp)
Burner Operation and Control
2-4
750-91 (revised 2009)
Model CB-LE Packaged Boiler Manual
2.4 — Controls for Gas Firing
Depending upon the requirements of the insurance carrier or other governing agencies, the gas flow control sys-
tem, or gas train, may consist of some, or all, of the items listed below.
Indicator Lights
Provide visual information of boiler operation as follows:
•
Flame Failure
•
Load Demand
•
Fuel Valve (valve open)
•
Low Water
Program Relay and Flame Safeguard Control
Automatically programs each starting, operating, and shutdown
period in conjunction with operating limit and interlock devices.
Includes, in a timed an proper sequence, the operation of the blower
motor, ignition system, fuel valve(s), and the damper motor. The
sequence includes air purge periods prior to ignition and upon
burner shutdown.
The flame detector portion of the control monitors both oil and gas
flames and provides protection in the event of loss of a flame signal.
The control recycles automatically during normal operation, or fol-
lowing a power interruption. It must be manually reset following a
safety shutdown caused by a loss of flame. An internal checking cir-
cuit, effective on every start, prevents burner operation in the event
anything causes the flame relay to hold in during this period.
Component
Description
Gas Pilot Valve
A solenoid valve that opens during the ignition period to admit fuel
to the pilot. It closes after main flame is established. The sequence
of energizing and de-energizing is controlled by the programming
relay. A second gas pilot valve may be required by insurance regula-
tions.
Gas Pilot Vent Valve
When a second gas pilot valve is required, a normally open vent
valve (optional equipment) is installed between them. Its purpose is
to vent gas to the atmosphere, should any be present in the pilot
line when the pilot valves are closed. The valve closes when the
pilot valves are energized.
Gas Pilot Shutoff Cock
For manually opening or closing the gas supply to the gas pilot
valve.
Gas Pressure Gauge
Indicates gas pressure to pilot.
Gas Pressure Regulating Valve
Reduces incoming gas pressure to suit the pilot.
Gas Pilot Aspirator
Provides complete mixing of gas and air to the pilot.
Gas Pilot Adjusting Cock
Regulates the size of the gas pilot flame.
Component
Description
Содержание CBLE
Страница 14: ...xiv 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Страница 48: ...Burner Operation and Control 2 22 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Страница 64: ...Waterside Care and Requirements 3 16 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Страница 72: ...Sequence of Operation 4 8 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Страница 133: ...750 91 revised 2009 Model CB LE Packaged Boiler Manual 8 13 8 12 Forced Draft Fan FIGURE 8 3 Forced Draft Fan Mounting...
Страница 158: ...Inspection and Maintenance 8 38 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Страница 165: ...750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 7 9 2 Parts Lists and Drawings 9 2 5 Control Panel...
Страница 166: ...Parts 9 8 750 91 revised 2009 Model CB LE Packaged Boiler Manual Control Panel...
Страница 167: ...750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 9 9 2 Parts Lists and Drawings 9 2 6 Entrance Box...
Страница 168: ...Parts 9 10 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 7 Front Head Electrical...
Страница 169: ...750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 11 9 2 Parts Lists and Drawings 9 2 8 Front Davit...
Страница 170: ...Parts 9 12 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 9 Front Head Insulation...
Страница 171: ...750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 13 9 2 Parts Lists and Drawings 9 2 10 Front Head Linkage...
Страница 174: ...Parts 9 16 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 12 Light Oil Air Piping...
Страница 175: ...750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 17 9 2 Parts Lists and Drawings Light Oil Air Piping...
Страница 176: ...Parts 9 18 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 13 Heavy Oil Air Piping...
Страница 177: ...750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 19 9 2 Parts Lists and Drawings Heavy Oil Air Piping...
Страница 178: ...Parts 9 20 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 14 Heavy OIl Alstrom Heater...
Страница 179: ...750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 21 9 2 Parts Lists and Drawings Heavy OIl Alstrom Heater...
Страница 182: ...Parts 9 24 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 16 IFGR Impeller...
Страница 183: ...750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 25 9 2 Parts Lists and Drawings 9 2 17 Pressure Controls...
Страница 184: ...Parts 9 26 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 18 Temperature Controls...
Страница 185: ...750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 27 9 2 Parts Lists and Drawings 9 2 19 W C Main Aux...
Страница 186: ...Parts 9 28 750 91 revised 2009 Model CB LE Packaged Boiler Manual W C Main Aux...
Страница 188: ...Parts 9 30 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 21 Rear Head Sealing Davit...
Страница 193: ......
Страница 194: ...e mail info cleaverbrooks com Web Address http www cleaverbrooks com...