Throat tile and furnace liner installation notes 67” and 78” boilers
Notes:
1) No insulation, cut bricks, or cut tiles to be installed in upper 120° section of the furnace.
2) Pack all bricks and tiles tightly with a mallet and remove excess mortar. Typical mortar joint
shall be approximately 1/16".
3) Do not apply mortar between insulation and bricks, tiles, or furnace.
4) Do not cover furnace weld seams with insulation. Cut a strip of insulation out to rev al weld.
5) During installation, support upper tiles with wooden supports in a diagonal fashion until row is
complete (use approx. 3/4" x 1-1/2" x 28" Lg. boards).
6) To insure a tight fit and maximum I.D. of arch bricks, place a 3" square scrap piece of insulation
as a shim between bricking tool collar and I.D. of upper half of arch bricks (as nessesary).
7) Stagger mortar joints on each row of liner tiles.
8) After each half course of bricks or tiles is installed, clean up excess cement and fill open joint areas
where necessary.
120°
SEE NOTE #1
250-350 HP
120°
SEE NOTE #1
400 HP
Содержание CBEX-DE
Страница 1: ...CBEX DE Dryback Elite Boiler 250 800 HP Operation and Maintenance 750 392 10 2019 ...
Страница 54: ...Preparations for Startup 3 22 750 392 CBEX DE ...
Страница 74: ...Startup and Operation 4 20 750 392 CBEX DE ...
Страница 104: ...Inspection and Maintenance 5 30 750 392 CBEX DE ...
Страница 122: ...Parts 6 18 750 392 CBEX DE 6 11 Temperature Controls Hot Water ...
Страница 124: ......