Preparations for Startup
3-16
750-392
CBEX-DE
INITIAL LINKAGE SETTINGS (continued)
In initially setting the linkage for the gas butterfly valve:
1.
Back off the low fire stop screw on the butterfly valve so that the valve is closed.
2.
Then run the screw out to touch the arm, and give it two complete turns.
3.
Adjust the connecting rod so that the override tension is released and so that the arm is now just touching the
stop screw.
4.
Tighten the locknuts on all ball joints.
BHP
Nox
A
B
C
D
E
F
G
H
J
K
PPM
Degrees Degrees
Hole #
Degrees
Hole #
Degrees
Hole #
Degrees
Hole #
Hole #
30
X
X
X
X
X
X
X
X
X
X
60/UNC
X
X
X
X
X
X
X
X
X
X
30
X
X
X
X
X
X
X
X
X
X
60/UNC
X
X
X
X
X
X
X
X
X
X
30
40
37
4
45
4
45
4
40
5
1
60/UNC
40
40
4
45
4
45
4
50
5
1
30
40
37
4
45
4
45
4
40
5
1
60/UNC
43
41
4
45
4
45
4
40
5
1
30
60
52
6
45
4
45
4
45
3
3
60/UNC
60
52
6
45
4
45
4
45
3
3
30
60
52
6
45
4
45
4
45
3
3
60/UNC
60
52
6
45
4
45
4
45
3
3
30
30
40
5
40
4
46
4
32
4
3
60
30
40
5
40
4
46
4
32
4
3
30
30
32
5
40
4
46
4
32
4
3
60
30
38
5
40
4
46
4
32
4
3
250
300
350
400
500
600
700
800
Содержание CBEX-DE
Страница 1: ...CBEX DE Dryback Elite Boiler 250 800 HP Operation and Maintenance 750 392 10 2019 ...
Страница 54: ...Preparations for Startup 3 22 750 392 CBEX DE ...
Страница 74: ...Startup and Operation 4 20 750 392 CBEX DE ...
Страница 104: ...Inspection and Maintenance 5 30 750 392 CBEX DE ...
Страница 122: ...Parts 6 18 750 392 CBEX DE 6 11 Temperature Controls Hot Water ...
Страница 124: ......