750-392
CBEX-DE
3-15
Linkage Settings (optional single-point systems)
INITIAL LINKAGE SETTINGS
BHP
Nox
A
B
C
D
E
F
G
H
J
K
PPM
Degrees
in
in
Hole #
Hole #
Degrees Degrees
Hole #
Degrees Degrees
30
x
x
x
x
x
x
x
x
x
x
60
x
x
x
x
x
x
x
x
x
30
x
x
x
x
x
x
x
x
x
x
60
x
x
x
x
x
x
x
x
x
30
40
1/4
6
2
5
30
70
8
35
60
35
3/16
6-3/4
2
5
45
45
8
20
30
40
1/4
6
2
5
30
70
8
35
60
35
1/4
6-3/4
2
5
25
65
8
20
30
45
1/2
6-1/2
2
4
20
80
8
30
20
60
45
1/4
3
2
4
25
85
8
30
30
45
1/2
6-1/2
2
5
20
80
8
30
20
60
45
1/4
3
2
5
25
85
8
30
30
45
1-1/4
7
2
5
23
92
8
40
44
60
45
3/4
7
2
5
23
92
8
40
30
45
1
7
2
5
23
92
8
40
44
60
45
3/4
7-3/8
2
5
23
92
8
40
700
800
250
300
350
400
500
600
40
n/a
40
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Содержание CBEX-DE
Страница 1: ...CBEX DE Dryback Elite Boiler 250 800 HP Operation and Maintenance 750 392 10 2019 ...
Страница 54: ...Preparations for Startup 3 22 750 392 CBEX DE ...
Страница 74: ...Startup and Operation 4 20 750 392 CBEX DE ...
Страница 104: ...Inspection and Maintenance 5 30 750 392 CBEX DE ...
Страница 122: ...Parts 6 18 750 392 CBEX DE 6 11 Temperature Controls Hot Water ...
Страница 124: ......