background image

13/11/2018 

 

Page 8 

Specifications 

powerPRO 300 

powerPRO 3AMP 

powerPRO 500 

Output Voltage / Inc 

5 - 300V / 1V 

5 – 300 / 1V 

5 – 500 / 1V 

Output Current / Inc 

1 - 700mA / 1mA 

10 – 3,000mA / 10mA 

1 – 800mA / 1mA 

Max. Watt 

150W 

300W 

300W 

Rated Voltages 

100~ 240V; 47-60Hz, 
200W: T2.5A/250V 

100-240V: 47-
60Hz,410W: T4A/250V 

100-240V: 47-
60Hz,400W: T4A/250V 

Type of Output 

1. Voltage or Current with automatic crossover 
2. When target constant mode is set, system automatically adjusts the 
two other parameter to maximum to allow constant run (later could be 
changed by user) 

Program Storage 

30 programmed files 

Program Multi-Step 

Up to 6 steps 

Editable Program 
Function 

1.Have typical running conditions program 
2.Manual editable program 

Display 

2.4” TFT 

Control 

Microprocessor controller 

Safety Device 

No Load detect 

Leakage detect 

Over temperature protection 

Over load detection 

Sudden load change detection (could be disabled by proper setting) 

Shrouded plugs and sockets 

Timer 

Constant: 1~999 mins with alarm, continuous 
Program: 1~999 mins with alarm, continuous 

Crossover 

Yes 

Stackable 

Yes 

Automatic Recovery 
After Power Failure

Yes 

IQ/OQ Protocols 

Yes, optional 

Regulatory 

CE, ETL 

CE 

CE 

Operating 
Temperature 

4

~ 40

Construction Material 

Flame retardant ABS faceplate 

Содержание powerPRO Series

Страница 1: ...POWERPRO...

Страница 2: ......

Страница 3: ...PRO500 powerPRO3AMP Record the following for your records Model _____________________ Catalogue No _____________________ Date of Delivery _____________________ Warranty Period _____________________ Se...

Страница 4: ...uipment Operation 5 Symbols 5 Potential Risk and Preventive Measures 6 Risk assessment table 6 Preventative measures 6 Packing List 7 Specifications 8 Operating Instructions 10 Installation 10 Control...

Страница 5: ...ore operating this equipment 1 Read and follow the manual instructions carefully 2 Do not alter the equipment Failure to follow these directions could result in personal and or laboratory hazards as w...

Страница 6: ...ation of the unit The powerPRO Power Supply has been designed to utilize shielded wires thus minimizing any potential shock hazard to the user Cleaver Scientific recommends against the use of unshield...

Страница 7: ...uction to see if the proposed method will damage the equipment Equipment Operation Follow the guidelines below to ensure safe operation of the unit 1 NEVER access dangerous chemicals or other material...

Страница 8: ...500 V Max current 800mA Max watt 300W Potential Risk and Preventive Measures Risk assessment table Frequency Risk Frequent Likely Possible Rare Unlikely Bruise Slash Electrical shock Power cord plug w...

Страница 9: ...acking lists should be referred to as soon as the units are received to ensure that all components have been included The unit should be checked for damage when received Cleaver Scientific is liable f...

Страница 10: ...be changed by user Program Storage 30 programmed files Program Multi Step Up to 6 steps Editable Program Function 1 Have typical running conditions program 2 Manual editable program Display 2 4 TFT Co...

Страница 11: ...Furthermore the powerful specifications plus five terminal pairs can be used for multi electrophoresis units simultaneously Cleaver Scientific powerPRO Series Power Supply provides Constant Voltage or...

Страница 12: ...the unit Press to move cursor left between parameters Pause Key Press to temporarily interrupt power to an operation in progress resume power after pausing without resetting the timer Press to move c...

Страница 13: ...witch on the back 5 The screen will show a loading screen for few seconds then enter to the mode selecting page Constant Mode Use the Constant Voltage Current Power Operation for applications that req...

Страница 14: ...lier will constantly operate until user manually stops it 5 Press the start Key to begin electrophoresis The LED next to the start key will light indicating the power supply is active Parameter values...

Страница 15: ...he operation set the Program Mode as follow 1 Use the up and down arrow keys to select program mode then press the enter key to move to the next page 2 Use the up and down arrows to select the desired...

Страница 16: ...run 8 Upon completion of the run an alarm will sound and the screen will display Complete 9 Press the start key to terminate the run and press the setting key to return to the settings screen Typical...

Страница 17: ...gories that can be selected Choose the model according to your experiment need 3 After selecting model the pre set value will display These values can be adjusted as described previously 4 Press the s...

Страница 18: ...chine back to local distributor or our Service Department for maintenance Operation stops with alarm The screen displays Electrophoresis leads are not connected to the power supply or to the electroph...

Страница 19: ...arm Display shows Ground leak detected during run Check the electrophoresis system for improper grounding Restart the power supply by turning the Power switch off and on Operation stops with alarm Dis...

Страница 20: ...nspect the fuses If the fuses are burned or there is a break in the fuses element replace the fuses with identical type of fuses 2 Place the fuses holder back into the compartment 3 Snap the cover clo...

Страница 21: ...anyone other than CSL or an appointed distributor or representative are no longer under warranty from the time the unit was modified Units which have accessories or repaired parts not supplied by CSL...

Страница 22: ......

Страница 23: ......

Страница 24: ......

Отзывы: