CLEARSPAN™ SCREEN HOUSE
8
Revision date: 12.19.07
Pipe Identification
Location
Pipe
Length
Leg Pipe
131P070
70"
Side Base Pipe 131P0705
70.5"
Leg Pipes
Side Base Pipes
ASSEMBLE THE LOWER FRAME
This section is an overview of the process for assembling
your lower frame assembly. See illustration below to
identify main parts of the assembly.
1. Locate the required couplers and pipes and assemble
the roof frame as shown below.
2. Secure each pipe in the coupler using the locking
eyebolt. If the couplers are not equipped with locking
eyebolts, secure each pipe in the coupler using a Tek
screw.
ATTENTION
: Position Tek screws so they will not
touch the main covers or side panels when these are
installed.
Frame shown may differ in length. At this time, DO
NOT install the pipe identified by the dashed line. It is
installed in a later procedure.