CLEARSPAN
™
FABRIC STRUCTURES
22
Revision date: 06.10.11
9. Remove any temporary fasteners and continue by
installing the roll-up assembly.
6. Center the cover end-to-end and verify that the roll-up
conduit is level across the ground. Temporarily secure
panel in place with 1.90" fabric clips if needed.
7. Move to the inside of the frame. Using scissors or a
utility knife,
notch or cut the roll-up panel
so that the
panel can wrap past the rafters and around the door
header as shown below.
Dashed lines show approximate location of the cuts.
4. Insert the roll-up conduit into the pocket along the
bottom of the roll-up panel.
5. With assistance, lift the panel and evenly wrap the
edge over the top of the door header pipe.
Inside View
8. Wrap the notched flaps around the door header and
secure to the pipe using 1.90" fabric clips and Tek
screws. See diagram below. Evenly space the clips as
needed.
IMPORTANT:
Position the clips on the underside or
backside of the door header pipe so that the head of
the Tek screw does not touch the main cover.
Inside View
Fabric Clips
INSTALL ROLL-UP ASSEMBLY
Gather the parts:
• Pipe 1.315'' x 75'' (#131S075)
• Pipe 1.315'' x 49.5'' (#131P0495)
• Spin handle (#103395)
• Universal joint (#103396)
• Fabric clips (#CC6212)
1. Move to the roll-up conduit, which was inserted into
the pocket of the roll-up panel and
position the conduit
in the pocket so that a few inches extends beyond the
pocket at the end where the crank will be attached as
shown below
.
2. Evenly space the fabric clips to secure the panel to the
conduit.
3. Attach the universal joint to the conduit in the pocket
using a Tek screw to secure the connection.
Fabric Clip
Space evenly
4. To assemble the extension pipe, connect the remaining
49.5" plain pipe and 75" swaged pipe and secure the
joint using a Tek screw.
INSTALL OPTIONAL FRONT ROLL-UP KIT (continued)
Frame length shown may differ from actual frame.