![Clearfield FieldSmart FxHD Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/clearfield/fieldsmart-fxhd/fieldsmart-fxhd_installation-manual_2621162019.webp)
19
FieldSmart
®
FxHD Frame
__________________________________________________________
Installation Manual
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • [email protected]
Manual 014815 REV C - Feb 2018
Clearview Blue Patch Only Installation in FxHD
Installing Clearview Blue patch only cassettes into the FXHD is as
simple as pulling the cable pigtail through the frame and pushing the
cassette block, which will already be factory mounted into the black
ganging rackets, into the appropriate area of the frame. Just push the
securing mechanism and the block locks into place.
Start by feeding the blunt end of the cable through the top of the frame
and into the fiber management used in this application.
Remove the cassette block from the packaging. Continue to feed the
blunt end of the cable until the cassette block is in place.
Now, insert the cassette block into the desired location with the block
almost touching the back of the frame. If applicable, slide the block up
to engage the one above, then slide it back in the frame to lock into
place. Each square screw will then need to be pressed until it clicks
into place to fully secure the block.
Note:
The actual number of “square mounting screws” will vary
depending on the port count of the cassette block. Square screws
highlighted here.
Continue to pull the fiber cable/pigtail through the frame until a slack
loop of the bend limiting tubing remains. Locate the green cable clamp
shells and corresponding mounting screws from the ship-along
hardware. Determine which clamp best fits the cable to be installed.
The cable clamp shells are used in the same size pairs.
Avoid using a clamp that is too small and does not easily close around
the cable. Instead, use the next larger clamp and pad with grommet
tape (included with the cassette block).