![Clearfield FieldSmart FxHD Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/clearfield/fieldsmart-fxhd/fieldsmart-fxhd_installation-manual_2621162011.webp)
11
FieldSmart
®
FxHD Frame
__________________________________________________________
Installation Manual
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • [email protected]
Manual 014815 REV C - Feb 2018
Using the isolation pad as a template, mark on the panel(s) of the raised floor the 4 holes where the frame is going to be
mounted. Using a 5/8” drill bit, drill a hole through each of the oblong marks you made with the isolation pad.
Take the threaded rods from the raised floor mounting kit and slide through each one of the holes. Using a hammer and
holding them perpendicular to the floor, tap on the end firmly. The goal is to make a “mark” on the concrete floor visible
enough to see where the 4 holes should be drilled.
Once the concrete floor is marked, remove the threaded rods and floor panels. Using a 5/8” masonry bit, drill the four
required holes to a minimum depth of 2” (approx. 50mm).
Note:
If for some reason you have trouble drilling the 5/8” hole, we recommend first drilling a 1/4” pilot hole before drilling
out to 5/8”.
Thoroughly clean the dust from each hole, using a vacuum device.
Note:
To not degrade the anchor’s installed performance, any unused anchor holes (or other nearby holes) in the concrete
within 3” must be filled with an epoxy filler (pour stone) or equivalent. Filled holes must be fully cured before anchors are
installed and torqued.