Operator's Manual: Models CB-3500 & CB-5000
5-1
SECTION 5: METERING PUMP PRIMING
Understanding Metering Pump Priming
Preparing your Clean Burn furnace for operation begins with priming the metering pump. The procedures in this
section must be performed in sequence
without interruption
to properly prime the pump.
Required Tools and Materials
The following tools and materials are required for oil pump priming and should be gathered before starting any
procedures:
• 3/8" open-end wrench
• 5/8" open-end wrench
• Rags
• Two containers (minimum one-gallon)
• Permatex #2 non-hardening gasket sealer
• Adjustable Wrench
• Pipe Wrench
Содержание CB-3500 series
Страница 2: ......
Страница 18: ...Operator s Manual Models CB 3500 CB 5000 1 10 ...
Страница 36: ...Operator s Manual Models CB 3500 CB 5000 3 16 ...
Страница 68: ...Operator s Manual Models CB 3500 CB 5000 5 6 ...
Страница 74: ...Operator s Manual Models CB 3500 CB 5000 6 6 ...
Страница 94: ...Operator s Manual Models CB 3500 CB 5000 9 10 ...
Страница 102: ...Operator s Manual Models CB 3500 CB 5000 10 8 ...
Страница 107: ...Operator s Manual Models CB 3500 CB 5000 A 5 ...
Страница 126: ...Operator s Manual Models CB 3500 CB 5000 A 24 ...
Страница 134: ...Operator s Manual Models CB 3500 CB 5000 C 2 ...