Operator's Manual: Models CB-1750, CB-2500 & CB-3250
5-1
SECTION 5: METERING PUMP PRIMING
Understanding Metering Pump Priming
Preparing your Clean Burn furnace for operation begins with priming the metering pump. The
procedures in this section must be performed in sequence
without interruption
to properly prime the
pump.
Required Tools and Materials
The following tools and materials are required for oil pump priming and should be gathered before
starting any procedures:
• 3/8" open-end wrench
• 5/8" open-end wrench
• Rags
• Two containers (minimum one-gallon)
• Permatex #2 non-hardening gasket sealer
• Adjustable Wrench
• Pipe Wrench
Содержание CB 140
Страница 2: ......
Страница 8: ...TABLE OF CONTENTS APPENDIX C Furnace Service Record C 1 ...
Страница 40: ...Operator s Manual Models CB 1750 CB 2500 CB 3250 3 20 ...
Страница 72: ...Operator s Manual Models CB 1750 CB 2500 CB 3250 5 6 ...
Страница 80: ...Operator s Manual Models CB 1750 CB 2500 CB 3250 7 4 ...
Страница 96: ...Operator s Manual Models CB 1750 CB 2500 CB 3250 9 10 ...
Страница 104: ...Operator s Manual Models CB 1750 CB 2500 CB 3250 10 8 ...
Страница 116: ...Operator s Manual Models CB 1750 CB 2500 CB 3250 A 12 BLOWER ASSEMBLY CB 1750 2 4 5 6 7 2 8 9 10 1 11 12 1 3 I88954 ...
Страница 128: ...Operator s Manual Models CB 1750 CB 2500 CB 3250 A 24 ...
Страница 142: ...Operator s Manual Models CB 1750 CB 2500 CB 3250 C 2 ...