Clayton Steam Generator model EO-100-1
PAGE 70 / 70
Instruction Manual, doc.nr.: MAN18206 Rev A PSC
Periodic maintenance
shall be done according to the scheme of the steam generator
(exhaust gas boiler).
•
Drain and flush the pressure equipment, open all handholes and manholes, clean and remove deposits
and scale from the inside. Examine the pressure equipment for damage and corrosion.
•
Have the pressure equipment inspected by an authorized inspector, as required.
•
Install new gaskets, replace all handhole and manhole covers, refill the pressure equipment
(section or
part),
and perform a hydrostatic test, if required.
•
Verify operation of all operating and limit controls, interlocks, and gauges.
•
Have the technician disassemble the waterlevel control devices to clean, recondition, and reassemble
them.
•
Have the technician test and check all limiters, controllers and monitoring devices.
•
Check all pressure equipment and piping for leaks and missing insulation and repair where needed
•
Make sure provision is made for establishing and keeping a maintenance logbook.
After performing maintenance,
•
Re-install all guards, shields, covers, and other safety devices. Install all fasteners provided for
attaching these devices to prevent accidental or unauthorized removal. Make sure all guards, shields,
covers, and other protective devices
(i.e. electrical interlock or alarm)
have been installed before
removing lockout protection. Be sure all safety devices are in place when the equipment is operating
again.
11.7.2
PRESSURE EQUIPMENT REPAIRS AND PART REPLACEMENTS.
WARNING !
Completely vent the internal pressure to the atmosphere and drain
completely before disassembling any piping, fittings, valves or other
components and before doing any repair work on pressure equipment.
All pressure equipment put on the EU market are manufactured, inspected and certified according to the PED
97/23/EC.
Repairs to such equipment are subjected to local National Regulations. The authorized inspector and local
jurisdiction must grant approval before the repair is made.
The firm making the repair must have qualified procedures, use qualified welders and Code-approved
materials. The repair must be inspected as required by the authorized inspector and local jurisdiction.
Only original parts may be used.
End Chapter - 11
END MANUAL
PSC 04-02-2014
Содержание EO-100-1M
Страница 31: ...Clayton Steam Generator model EO 100 1M PAGE 31 70 Instruction Manual doc nr MAN18206 Rev A PSC ...
Страница 32: ...Clayton Steam Generator model EO 100 1M PAGE 32 70 Instruction Manual doc nr MAN18206 Rev A PSC ...
Страница 33: ...Clayton Steam Generator model EO 100 1M PAGE 33 70 Instruction Manual doc nr MAN18206 Rev A PSC End Chapter 7 ...