Initial Operation
Remove the main device and accessories from the box. Also remove any packa-
ging materials that may be present.
Filling up the Heating Boiler before Use!
Before the tank cap is opened it must be ensured that the device is not under any
pressure. Please proceed as follows:
1. Open the cover on the main device and attach the
connection head (17).
2. Connect the device to a correctly installed 230 V/50
Hz power socket.
3. Switch on the steam control button (19). The green
control lamp lights up.
4. Release the pressure by using the steam switch (5).
5. Remove the plug from the socket.
6. Caution! Danger of Injury! Please open the safety
lock (4) only when no more steam comes out of
the nozzle.
Turn the lock in an anticlockwise direction.
If the device is still warm, please wait 5 minutes before
removing the seal completely. Press the seal down-
wards and turn.
Note: For your protection the safety lock has a release
device. If the pressure in the kettle is still too high, this
release device prevents it from being opened.
7. Shake any residual water out of the kettle (2). Fill fres-
hwater from the measuring beaker (9) into the kettle.
Do not overfill! Do not exceed the quantity of water
stated on the measuring beaker, i.e. 1.2 litres!
8. Re-fasten the safety lock (4).
50
GB
5....-05-DR 2890 24.06.2004 14:04 Uhr Seite 50
Содержание DR 2890
Страница 73: ...73 RUS 5 05 DR 2890 24 06 2004 14 04 Uhr Seite 73...
Страница 74: ...45 1 10 2 2 11 12 3 13 4 14 15 H a 5 16 6 17 C 7 18 8 19 9 74 RUS 5 05 DR 2890 24 06 2004 14 04 Uhr Seite 74...
Страница 75: ...1 17 2 230 50 3 19 4 5 5 6 4 5 7 2 9 1 2 8 4 75 RUS 5 05 DR 2890 24 06 2004 14 04 Uhr Seite 75...
Страница 76: ...3 10 3 12 11 12 13 14 1 230V 50Hz 2 17 76 RUS 5 05 DR 2890 24 06 2004 14 04 Uhr Seite 76...
Страница 78: ...4 5 1 2 78 RUS 5 05 DR 2890 24 06 2004 14 04 Uhr Seite 78...
Страница 79: ...79 RUS 5 05 DR 2890 24 06 2004 14 04 Uhr Seite 79...