Avoid operating on the machine if the hydraulic system is not fully equipped with oil.
When moving the platform you have to adjust the space between the two bases and make
sure that the two bases are parallel.
THE EXECUTION OF THESE TRANSACTIONS MUST BE CARRIED OUT ONLY BY
AUTHORIZED AND COMPETENT PERSONNEL, ALL THE INSTRUCTIONS GIVEN BY THIS
MANUAL SHOULD BE FOLLOWED TO PREVENT POSSIBLE DAMAGE TO THE LIFTER OR
RISK OF DAMAGE TO PERSONS.
Only the specialist technicians appointed by the manufacturer or their authorized resellers
are authorized to install the lift.
INSTALLATION REQUIREMENTS
See «TRANSPORTING AND STORAGE» on page 4 for transporting and storing the machine.
Platforms installation:
The lift must be installed respecting the given specific safety distance from wall and
from other equipment (Figure 12)
The security distances from the walls must be at least 1000 mm, taking into account the
space required to work comfortably, the space required for the control station and any
escape routes in case of emergency.
The area must be predisposed for the power supply and the pneumatic supply of the
elevator.
The area where the lifts are installed must have a height of at least 4000 mm.
The lift must be positioned on a perfectly leveled and sufficiently strong floor. (
≥
250 kg
/ cm², concrete thickness
≥
150 mm)
All parts of the lift must be sufficiently lighted to ensure that the adjustment and
maintenance operations can be carried out safely, with no reflection or glare, which may
cause eye problems.
The integrity of the incoming product must be verified before installing the lift.
Moving and installing the lift must be done as shown in Figure 12.
Place the 2 bases in the final position.
The bottom of the cylinder is in the direction of access to the vehicle.
Use a forklift or other lifting equipment to move the platform (Figure 13) and make sure
that the safety devices have been activated and locked.
INSTALLATION
Содержание PE 6004
Страница 1: ...clas com PONT DOUBLE CISEAUX DOUBLE VERIN 3 5T DOUBLE SCISSOR LIFT DUAL CYLINDER 3 5T PE 6004...
Страница 22: ...PE 6004 PONT DOUBLE CISEAUX DOUBLE VERIN 3 5T 22 SCH MA DE RACCORDEMENT DES CONDUITES D HUILE ANNEXES...
Страница 49: ...PE 6001 DOUBLE SCISSOR LIFT 3T PE 6004 DOUBLE SCISSOR LIFT DUAL CYLINDER 3 5T 49 51...
Страница 51: ......
Страница 52: ......
Страница 53: ......
Страница 54: ......
Страница 55: ......