
16
Parts & Service: 020 8988 7400 / E-mail: [email protected] or [email protected]
EVERY MONTH OR AFTER 100 HOURS OF WORK
CLEAN THE COMBUSTION HEAD AND CHECK THE ELECTRODES.
It is recommended that the burner and electrodes be serviced yearly, or
as needed depending upon the pressure washers' usage, Please contact the
CLARKE International Service Dept.
(This maintenance operation must be carried out by skilled personnel.)
EVERY MONTH 0R AFTER 200 HOURS OF WORK
CLEAN THE COMBUSTION PUMP FILTER.
(This maintenance operation must be carried out by skilled personnel.)
SOOT BUILD UP
Poor grades of fuel oil or inadequate combustion will cause heavy build
up of soot on the heating coil. This deposit will insulate the coil and
reduce its efficiency. It will also restrict air flow through the coil, further
aggravating the soot build up. Contact your CLARKE dealer or CLARKE
International Service Dept. on: 020 8988 7400 when de-sooting is required.
HLS160 3 Phase hot wash.fm Page 16 Wednesday, September 28, 2011 12:28 PM
Содержание HLS160
Страница 24: ......