Maintenance
24
7.
Maintenance
The generator is equipped with a list of consumable components for each of
them a working time is preset during the testing phase, in order to enable the
user to perform programmed maintenance.
This time is decreased till its expiry during normal operation. When the time is
over the generator generates automatically a request for maintenance interven-
tion.
m
Before to do any type of operation on the generator, make sure that
are mounted the stabilizers
(par. 4.2.5.)
.
7.1.
Deadline warnings
When the forecasted autonomy of a component expires during normal opera-
tion, an alarm message is displayed, for example:
WARNING
EXHAUSTED SILENCER
In order to acquire the message, press the Function key
..
The message di-
sappear following this operation, and you can procede with normal operation.
The generator will ask if the maintenance has been performed every successive
switching on, showing on the display a message, for example:
SILENCER SUBSTITUTION DONE?
NO
Pressing the up arrow key
” select the reply “YES” oR “NO” consequentely.
To acquire the reply after selecting it press the function key.
Should the reply be “NO”, the message will be repeated to next switch off;
Should the reply be “YES”, the generator sets a new working time of the com-
ponent (the same set the first time) for a future maintenance.
Should be the alarm for incorrect switch-off be present, this procedure isn’t ac-
tivated; it will be anyhow available for next start up.