Nitrogen generator
N2 LCMS 1
13
6.2.
Initial start-up
6.2.1.
Configuration
The generator leaves the factory pre-set and ready to start production The user
can access the configuration of a number of parameters (e.g. language, start-up
mode, etc). See section Parameter settings
6.2.2.
Operation sequence
1.
Check that all connections are made as specified in chapter 4 (INSTALLATION)
2.
Close the nitrogen line, downline of the generator
3.
Switch on the generator, by setting the POWER key to ON (see par. 6.3.
Generator start-up)
4.
Start nitrogen production by pressing the key START-STOP (see par. 6.4.
Nitrogen production)
5.
IMPORTANT!! When AIR pressure reach 4 bar open the on/off valve at the
DRAIN outlet. For see the AIR pressure gauge remove the frontal
6.
Wait until the generator reaches the Standby status. In this status, the
generator interrupts the normal production cycles and the display shows the
message STAND-BY.
7.
From this point the nitrogen is available for the line, by opening the valve
closed in point 2.
e
WARNING: On initial start-up, the internal nitrogen storage tank will initially con-
tain air: for this reason, the line should be purged (for approx. 20 minutes) be-
fore using the nitrogen.
6.3.
Generator start-up
To switch on the generator, press the black key “POWER” at the front of the ge-
nerator.
The display illuminates and, after a few seconds, a depressurisation cycle is star-
ted automatically. During this phase, lasting maximum 60 seconds, the following
message is displayed:
WAIT…
DEPRESSURISATION IN PROGRESS
At the end of depressurisation, the following message is displayed:
GENERATOR READY
In this condition, the generator is ready to receive the production start-up com-
mand (see par. 6.4.) or shutdown command (see par. 6.6.).