
ESD2
Series
I
I/O Cable length
H
Controller
J
Mounting
bracket
F
G
Relay cable length
Origin position
D
Stroke
C
Screw lead
*1: When
G
controller is set to "N", also
select "N" for
H
I/O cable.
ESD2-55E12-05NF-S1A2F
A
Body size
: 55
B
Motor mounting direction : standard mounting (straight)
C
Screw lead
: 12 mm
D
Stroke
: 50 mm
E
Brake
: without brake
F
Origin position
: opposite side of the motor
G
Relay cable length
: fixed cable 1 m
H
Controller
: EC07 standard mounting
I
I/O Cable length
: 2 m
J
Mounting bracket
: flange bracket included
ESD2
How to order
Model No.
Set model No. (actuator, controller, cable)
Code
Content
Body size
35
Body size 35
45
Body size 45
55
Body size 55
Motor mounting direction
E
Standard mounting (straight)
R
Right-hand mounting
L
Left-hand mounting
D
Bottom mounting
Screw lead
06
6 mm
12
12 mm
Stroke
Code
Length
Body size
35
45
55
05
50 mm
10
100 mm
15
150 mm
20
200 mm
25
250 mm
30
300 mm
Brake
N
Without brake
B
With brake
Origin position
M
Motor side
F
Opposite side of the motor
Relay cable length
N0
None
S1
Fixed cable
1 m
S3
Fixed cable
3 m
S5
Fixed cable
5 m
SX
Fixed cable
10 m
R1
Movable cable 1 m
R3
Movable cable 3 m
R5
Movable cable 5 m
RX
Movable cable 10 m
Controller
N
None *1
A
EC07
standard mount
B
EC07
DIN rail mount
C
EC63
standard mount
D
EC63
DIN rail mount
E
ECPT
standard mount *2
F
ECPT
DIN rail mount *2
I/O Cable length
N
None
2
2 m
3
3 m
*3
5
5 m
*3
Mounting bracket
N
None
L
Foot bracket included
F
Flange bracket included
S
Spacer (body size 35, 55 only)
A
B
C
D
E
F
G
H
I
J
55
12 05 N F S1 A 2 F
E
[Example of model No.]
Body size
A
Stroke
D
N0 N N N
Motor mounting
direction
Actuator body discrete model No.
B
Screw lead
C
Origin position
F
ESD2 55 E 12 05
F
N
Brake
E
Series
Mounting method
*For details, refer to "How to order" on page 29.
*Refer to page 42 for details.
Controller individual model No.
Cable discrete model No.
Relay cable
I/O Cable
Cable length
07
Fixed/movable
Cable length
S
5
5
EC CBLME1
EC CBLIF1
EC 07 B
Controlle Series
A
Body size
B
Motor mounting direction
E
Brake
*2: Use a PLC unit which meets the ECPT pulse train signal input
specifications (refer to page 34).
*3: If the code for the controller is E or F, these cables can be used
only when the differential system is used as the pulse train signal
system. Only a cable length of 2 m can be used with the open
collector system.
15
Содержание ERL 2-45
Страница 1: ...Space saving installation Flexible motor mounting...
Страница 43: ...ME M O MEMO 36...
Страница 51: ...ME M O MEMO 44...