Junior’s height from
ground:
700mm
Senior’s height from
ground:
900mm
Junior’s Timber
height from
ground:
80mm
Senior’s Timber
height from
ground:
280mm
Step 4.
NOTE: The following is a two-man operation
.
Place unit on pre-fixed timber support. Drill & bolt to wall at 2 locations to hold the unit in place
to enable drilling of all screw holes.
See step 5 for fixing details
Step 3.
NOTE: Junior and Senior have different heights
Drill & bolt to wall at
these 2 locations
Installation details
Aquafil® Hydrobank Triple
Step 1.
Remove the top and bottom panels by unscrewing all M6 screws and M5 screws for the hinges.
When removing the Top Panel disconnect hoses from the bottle refill nozzles.
Step 2.
Screw a timber support to the wall. This will assist you in resting the Hydrobank unit while you
mark out the holes for the mounting screws. Make sure the timber is level.
See Step 3 for heights of timber.
Pushing tube in before
pulling it out helps to
release tube
Push in collet
to release tube
Tube is secured
in position
Simply push in
tube to attach
Issued: April 2021